Verdé Environmental Group

Sector

Quarries planning, monitoring and compliance for extraction sites

The EPA’s guidelines for the extractive industry recommend dust deposition of no more than 350 mg/m² a day at the site boundary, averaged over 30 days.

Last updated by Verdé Environmental Group

Key takeaways

  • Quarries with an extraction area over 5 hectares need an EIA report.
  • EPA dust guideline: 350 mg/m² a day at the boundary, averaged over 30 days.
  • EPA noise guidelines at the nearest homes: 55 dB(A) by day, 45 dB(A) at night.
  • Blasting guidelines: 12 mm/s ground vibration and 125 dB air overpressure.
Rock quarry section: stepped benches, crushing and conveyor plant, settlement lagoons and the groundwater table.
A rock quarry in section: stepped benches in bedrock, crushing and conveyor plant, settlement lagoons, and the groundwater table below the quarry floor.

What environmental support does a quarry need?

Two stages: the planning application, with its EIA report, screening and Appropriate Assessment; and then years of monitoring dust, noise, blasting and water against the conditions the permission sets. We prepare the reports and run the monitoring.

Verdé’s environmental expertise in the quarrying and aggregates sector plays a crucial role in helping our clients maintain their compliance, minimise their environmental footprint, mitigate risks, and contribute to the sustainable development of communities and ecosystems. Verdé assist our clients in the planning permission process and application, providing all the necessary environmental expertise and required reporting.

Typical challenges we solve

  • Planning permission process and application support
  • Environmental regulations and permitting compliance
  • Air, noise, water and soil sampling and analysis
  • EIAR, Appropriate Assessment Screening and Natura Impact Statements

This page is for operators of sand, gravel and rock quarries and aggregates sites in Ireland. Your planning conditions set the limits that apply to your site; this page uses the EPA guideline values as the reference.

Is this right for you?

This is a fit if

  • You are applying for planning permission for a new or extended quarry.
  • You need an EIAR chapter, EIA screening or Appropriate Assessment.
  • You need dust, noise, blast, water or soil monitoring for your conditions.
  • A neighbour or the council has raised dust, noise or blasting.

This is not a fit if

  • You need blast design or explosives supply.
  • You need mineral prospecting or resource surveys.

For blast design, your shotfirer leads. For the monitoring of every blast, and the reports behind the planning permission, we can help.

Does a quarry need an EIA report?

A new or extended quarry needs one when the area of extraction would be greater than 5 hectares, under Schedule 5 of the Planning and Development Regulations. Smaller quarries are screened, and an Appropriate Assessment is needed where a Natura 2000 site could be affected.

The threshold is class 2(b) of Schedule 5, Part 2: extraction of stone, gravel, sand or clay. Planning authorities attach conditions on environmental management to the permission, and appeals now go to An Coimisiún Pleanála, which replaced An Bord Pleanála in June 2025 (Department of Housing).

We prepare EIAR chapters, screening reports and Natura Impact Statements for quarry applications (appropriate assessments). SACs are designated under the EU Habitats Directive (NPWS).

What dust, noise and blasting limits do quarries work to?

The EPA’s guidelines for the extractive industry recommend 350 mg/m² a day of dust deposition at the boundary, 55 dB(A) by day and 45 dB(A) at night at the nearest homes, 12 mm/s of blast vibration and 125 dB of air overpressure. Planning conditions set the limits that apply.

Quarry reading check

Check a dust, noise or blast reading against the EPA guideline values. Nothing is stored or sent.

What are you checking?

Choose what you are checking, then enter the reading.

How the reading check decides
EPA guideline values for quarries
What you enterThresholdWhat it triggers
Dust deposition, averaged over 30 daysmore than 350 mg/m² a daydust
Daytime noise, 08:00 to 20:00, LAeq over 1 hourmore than 55 dB(A)daytime noise
Night-time noise, 20:00 to 08:00, LAeq over 1 hourmore than 45 dB(A)night-time noise
Ground vibration, peak particle velocitymore than 12 mm/sblast vibration
Air overpressure, linear maximum peakmore than 125 dBair overpressure

Guideline values from the EPA’s Environmental Management in the Extractive Industry (2006). Your planning conditions set the limits that apply to your site.

Where quarry guideline values are measuredQuarry section: dust at the boundary, 350 mg/m² a day; noise at the home, 55 and 45 dB(A); blasting, 12 mm/s and 125 dB.Quarry site350 mg/m² a daydust deposition at thesite boundary, 30-day average55 dB(A) by day45 dB(A) at night, hourlyLAeq at the nearest home12 mm/s and 125 dBblast vibration and air overpressurewhere they are received
Each guideline value applies at a different place: dust at the site boundary, noise at the nearest noise-sensitive homes, and blasting where the vibration is received. Not to scale. Source: EPA, 2006.
Data behind this graphic: EPA guideline values for quarries
WhatGuideline valueWhere it is measuredSource
Dust deposition350 mg/m² a day, averaged over 30 daysSite boundaryEPA, 2006
Noise, daytime 08:00 to 20:0055 dB(A) LAeq over 1 hourNearest noise-sensitive homeEPA, 2006
Noise, night-time 20:00 to 08:0045 dB(A) LAeq over 1 hourNearest noise-sensitive homeEPA, 2006
Blast ground vibration12 mm/s peak particle velocityReceiving locationEPA, 2006
Blast air overpressure125 dB linear maximum peakReceiving locationEPA, 2006

How are quarry dust, noise and blasting monitored?

Dust deposition is measured at the site boundary with Bergerhoff gauges and averaged over 30 days; noise is measured at the nearest noise-sensitive homes as hourly averages; and each blast is monitored for vibration and air overpressure where it is received. Results are reported against the planning conditions.

For noise, the guidelines also say 95% of all readings should comply, and no reading should exceed the limit by more than 2 dB(A). Our air, noise and acoustics page covers the monitors and their telemetry.

What water monitoring does a quarry need?

Usually groundwater around the pit and the quality of any water pumped out or discharged, as the planning conditions or a discharge licence set. Our drilling team installs monitoring wells, and our environmental team samples them and reports the results.

A discharge to a river or stream needs a Section 4 licence from the local authority. Our hydrogeology page covers wells, sampling and abstraction.

Do quarries need an EPA licence?

Aggregate quarries are mainly regulated through planning permission and its conditions. The EPA licence class 1.3 covers minerals within the meaning of the Minerals Development Acts, which exclude stone, gravel, sand and clay except where listed, so most aggregates are non-scheduled minerals.

Class 1.3 of the First Schedule applies to metalliferous operations, and to other operations extracting or processing more than 200,000 tonnes of those minerals a year or with a total yield above 1,000,000 tonnes. The EPA’s guidelines note that construction aggregates and dimension stone come mostly from non-scheduled minerals.

What changes the job at a quarry?

The stage, the size and the neighbours: a new or extended quarry needs the planning reports first; a working quarry needs monitoring rounds; and the nearer the homes and the more sensitive the water around the pit, the more monitoring the conditions ask for.

If this is true of your quarry

  • If a new or extended quarry’s extraction area would be greater than 5 hectares

    then an EIA report is mandatory with the planning application.

  • If the quarry could affect a Natura 2000 site

    then it needs Appropriate Assessment screening, and a Natura Impact Statement where effects cannot be ruled out.

  • If dust deposition at the boundary is above 350 mg/m² a day

    then it is over the EPA guideline value; check it against your planning conditions.

  • If a blast exceeds 12 mm/s of vibration or 125 dB of air overpressure

    then it is over the EPA guideline values for blasting.

How Verdé compares on what quarry operators weigh up
CriterionVerdéWhat it means for you
PlanningEIAR chapters, screening and Natura Impact StatementsThe environmental case for the application from one team.
MonitoringDust, noise, vibration, water and soilEvery common planning condition covered.
Real-time dataTelemetered dust and noise monitorsResults visible off site as they happen.
WellsOur own drilling crewsMonitoring wells installed and sampled by one firm.
Staffed officesKilcoole, Castlebar and CorkTeams in the east, west and south.

Quarry questions we are asked most

Still have a question? Call 01 201 1260 or email info@verde.ie.

Does a quarry in Ireland need an EIA report?

A new or extended quarry needs an EIA report when the area of extraction would be greater than 5 hectares, under class 2(b) of Schedule 5 to the Planning and Development Regulations. Smaller quarries are screened to decide whether one is needed. Where a Natura 2000 site could be affected, Appropriate Assessment applies as well. Verdé prepares both.

What are the dust limits for a quarry?

The EPA’s guidelines for the extractive industry recommend total dust deposition of no more than 350 mg/m² a day at the site boundary, averaged over a 30-day period and measured with the Bergerhoff method. Your planning conditions set the limit that applies to your quarry. Verdé runs the gauges, sends the samples for analysis and reports the results against those conditions.

What noise limits apply to a quarry?

The EPA guidelines recommend 55 dB(A) by day, from 08:00 to 20:00, and 45 dB(A) at night, from 20:00 to 08:00, as hourly LAeq values at the nearest noise-sensitive homes. They add that 95% of readings should comply and none should exceed the limit by more than 2 dB(A). Your planning conditions set the limits that apply.

What are the blasting limits for a quarry?

The EPA guidelines recommend a peak particle velocity of no more than 12 mm/s for ground vibration, measured in any of three directions at the receiving location, and an air overpressure of no more than 125 dB as a linear maximum peak, with a 95% confidence limit. Planning conditions set the limits that apply, and every blast is monitored against them.

Can Verdé install groundwater monitoring wells at a quarry?

Yes. Our drilling team installs monitoring wells and our environmental team samples and reports on them. In a disused basalt quarry in Co. Antrim in 2023, we supervised the drilling of a production well for an anaerobic digestion plant, installed bedrock monitoring wells, ran a 3-day constant rate pumping test and prepared the hydrogeological report for its groundwater abstraction licence application.

Do quarries need an EPA licence?

Aggregate quarries are mainly regulated through planning permission and its conditions. The EPA licence class 1.3 covers minerals within the meaning of the Minerals Development Acts, which exclude stone, gravel, sand and clay except where listed. It applies to metalliferous operations and to operations above 200,000 tonnes a year. Other activities on site can need their own licences.

What is a Natura Impact Statement?

It is the report prepared at Appropriate Assessment stage when a project, such as a new or extended quarry, could affect a Natura 2000 site and screening cannot rule out significant effects. The planning authority uses it to make its decision. Verdé prepares Appropriate Assessment screening reports and Natura Impact Statements for quarry applications.

Terms used on this page

Dust deposition
Dust deposition is the mass of dust settling on an area each day, in mg/m², measured with Bergerhoff gauges.
LAeq
LAeq is the average A-weighted sound level over a set period, such as one hour.
Peak particle velocity
Peak particle velocity is the highest speed of ground movement during a blast, in mm/s.
Air overpressure
Air overpressure is the pressure wave in air from a blast, measured in dB.
Non-scheduled minerals
Non-scheduled minerals include the stone, gravel, sand and clay that the Minerals Development Acts largely leave out.

Sources and further reading

  1. Environmental Management in the Extractive Industry (Non-Scheduled Minerals)Environmental Protection Agency, 2006. Guideline limits for dust, noise, blast vibration and air overpressure.
  2. Current EIA screening thresholds (Schedule 5, Part 2)Department of Housing, Local Government and Heritage, checked 3 November 2026. The project sizes above which an EIA report is mandatory, for applications lodged up to 25 November 2026.
  3. An Coimisiún Pleanála, Ireland’s national independent planning body, launchedDepartment of Housing, Local Government and Heritage, 2025. An Coimisiún Pleanála replaced An Bord Pleanála on 18 June 2025.
  4. Special Areas of ConservationNational Parks and Wildlife Service, checked 3 November 2026. What SACs are and how Natura 2000 sites are designated.
  5. First Schedule to the EPA Act 1992, as amendedEnvironmental Protection Agency, checked 3 November 2026. The activity classes and capacity thresholds that bring a site under an EPA licence.

Read this page in Markdown

Tell us about the quarry

What we ask for

  • The quarry location
  • The planning or licence conditions in place
  • Current monitoring results
  • Details of any water discharges
  • Any complaint or regulator correspondence

Reply

Within one working day.

For a spill or pollution incident, phone 0818 714 002 at any hour. The duty engineer confirms the response on the call.

Office 01 201 1260 or info@verde.ie