Real time noise and vibration monitoring at site boundaries or at sensitive neighbouring properties.

Project narrative
Real time noise and vibration monitoring at site boundaries or at sensitive neighbouring properties.
Management of environmental requirements to include surface water sampling , waste management , site audits etc.
Verde Environmental Consultants are managing the environmental requirements for several construction sites throughout the country including:
Ballymore Eustace Water Treatment Plant (on behalf of Irish Water)
Circle K Motorway Service Station development sites in Athlone (M6) and Kilcullen (M9) (on behalf of Killeen Civil Engineering )
More in this sector
Environmental Consultancy
Soil Waste Classification – Collen Construction
Excavation of fourteen trial pits; locations were selected at key strategic positions around the site and trial pits generally extended down to depths of between 2.0 and 3.0m below ground level.
Environmental Consultancy
Environmental Services
Construction and Demolition Waste Management Plan – Advise on key environmental obligations and waste management procedures that apply to contractor organisations, their subcontractors and employees while completing construction and demolition activities on the proposed developme
Environmental Consultancy
Phase II Environmental Site Assessment
Obtaining representative soil samples to determine potential impact to the land from the discharge.