Environmental Consultancy
Environmental Services
Construction and Demolition Waste Management Plan – Advise on key environmental obligations and waste management procedures that apply to contractor organisations, their subcontractors and employees while completing construction and demolition activities on the proposed developme

Project narrative
Construction and Demolition Waste Management Plan – Advise on key environmental obligations and waste management procedures that apply to contractor organisations, their subcontractors and employees while completing construction and demolition activities on the proposed development site and specifically to address conditions laid out in the relevant planning permission.
Soil Waste Classification – Retrieval of representative subsurface soil samples from the site; Laboratory analysis; Completion of Waste Classification using HazWasteOnline™ Tool and Assessment using Waste Acceptance Criteria (WAC) requirements; Reporting with recommendations for recovery/disposal.
Invasive Species Survey – To confirm the presence and identify the locations of species of plant on the site that are listed as non-native invasive species in Ireland.
Pre-demolition/Refurbishment Asbestos Survey – To identify the presence, location and condition of all asbestos-containing materials (ACMs) within areas that will be disturbed during the planned demolition works; produce a report identifying areas of confirmed and suspected asbestos with commentary on condition and extent. Recommendations for management.
Environmental Services to Multiple Construction Sites Nationwide
Verde Environmental Consultants was commissioned by OC Architects & Design on behalf of Seabren Developments Ltd to carry out multiple environmental services on a proposed residential development site in Terenure, Dublin.
Proposed Residential Development, Derelict Site, Terenure, Dublin
More in this sector
Environmental Consultancy
Soil Waste Classification – Collen Construction
Excavation of fourteen trial pits; locations were selected at key strategic positions around the site and trial pits generally extended down to depths of between 2.0 and 3.0m below ground level.
Environmental Consultancy
Phase II Environmental Site Assessment
Obtaining representative soil samples to determine potential impact to the land from the discharge.
Environmental Consultancy
Environmental Services to Multiple Construction Sites Nationwide
Real time noise and vibration monitoring at site boundaries or at sensitive neighbouring properties.