Site investigation drilling in Ireland, by our own crews

Cable percussion, rotary and window sampling, run by Verdé crews from Kilcoole, Castlebar and Cork.

Last updated

Track-mounted drilling rig beside a groundwater monitoring well, with dewatering hoses feeding a settlement tank.
Drill string passing topsoil, made ground, glacial till and sand and gravel to bedrockTopsoilMadegroundGlacialtillSand andgravelBedrock

Verdé drills site investigation boreholes and trial pits across Ireland with its own rigs and crews. Holes can be finished as groundwater or ground-gas monitoring wells, dewatering wells or abstraction boreholes. Every hole is logged, every well gets an installation record, and the findings are written up in one factual report.

This page covers drilling in Ireland: boreholes and trial pits to see, sample and monitor the ground. Groundwater models and abstraction dossiers sit on Hydrogeology, and full groundwater control design sits on Construction dewatering. Both are part of our wider environmental consultancy work. Verdé’s Nigeria work runs from its Lagos office.

Key takeaways

  • Verdé drills with its own rigs and crews: cable percussion, rotary, window sampling and trial pits.
  • Investigation boreholes can be finished as groundwater or ground-gas monitoring wells.
  • Every hole ends in a log, and every well ends in an installation record.
  • Geological Survey Ireland's geotechnical viewer maps the boreholes and site investigations that industry has submitted. Check it before drilling.
  • Abstraction boreholes come with test pumping and yield data for the EPA step.

Is this right for you?

This is a fit if

  • You need boreholes or trial pits for a geotechnical or environmental ground investigation in Ireland.
  • You need groundwater or ground-gas monitoring wells installed, developed, sampled or decommissioned.
  • You are drilling an abstraction borehole and need test pumping and yield data.
  • Your excavation needs deep wells or wellpoints for groundwater control.

This is not a fit if

  • Oil or fuel is leaking right now: call the 24/7 spill line on 0818 714 002.
  • You need building materials sampled for asbestos: see asbestos surveys and testing.
  • You only need a desk review of existing ground data, with no new holes.

If it is not a fit: desk reviews and groundwater models go to Hydrogeology, and live spills go to 24/7 spill response.

Which drilling method suits your ground?

Ground type and purpose decide the method. Cable percussion suits soils, rotary drilling suits rock and deeper wells, window sampling suits fast shallow sampling, and trial pits show the ground in section. Verdé runs all four in-house. Most geotechnical boreholes in Ireland are 0 to 30 metres deep (GSI).

Drilling Method Matcher

Three questions, one suggested method. Nothing you choose is stored or sent.

1. What are the holes for?
2. What is the ground like?
3. What is the access like?

Choose a purpose, the ground and the access to see a suggested method.

How the matcher decides
Rules behind the Drilling Method Matcher
If you chooseWe suggestWhy
Rock near the surfaceRotary drilling, with trial pits for the shallow layerRotary cuts rock that cable percussion cannot.
Geotechnical design data in soilsCable percussion boreholes plus trial pitsRecovers soil samples and in-situ tests at set depths.
Contamination samplingWindow sampling plus trial pits, with monitoring wells where groundwater is a concernFast continuous cores and a clear view of made ground.
Groundwater or ground-gas monitoring wellThe method that suits the ground, finished as a wellThe hole is built so later samples come from the target depth.
Water supply or abstraction wellRotary drilling, then test pumping and a yield assessmentYield data supports the EPA registration or licence step.
Dewatering wellDeep wells or wellpoints, designed with the dewatering teamGroundwater control is sized from the dig, not the hole.
Narrow, low or indoor accessWindow sampling or hand-dug pitsSmaller kit fits where a full rig cannot.
Not sure of the groundTrial pits first, then boreholes where the pits stopPits show the shallow ground quickly and cheaply.

How this works: the rules follow general ground investigation practice. Verdé confirms the method after reading your brief.

Drilling methods Verdé runs in-house
MethodBest forWhat it recoversCan it become a well?
Cable percussionSoils: clays, silts, sands and gravelsDisturbed and undisturbed soil samples, plus in-situ testsYes
RotaryRock, hard strata, deeper and production wellsRock core or cuttingsYes
Window samplingFast, shallow sampling on tight or contaminated sitesContinuous soil core in linersYes, small-diameter
Trial pitSeeing the strata in sectionBulk samples and photos of the pit faceNo

What comes out of each borehole?

Records you can use. Every borehole and trial pit is logged, every monitoring well gets an installation record, abstraction holes get test pumping and yield data, and the investigation is written up as a factual report. A well that is no longer needed is decommissioned and recorded.

Drilling deliverables and what they are for
DeliverableWhat you use it for
Borehole and trial pit logsDesigners and consultants read the ground conditions from them.
Monitoring well installation recordsThey show where the screen sits, so later samples can be trusted.
Test pumping and yield dataThey support the abstraction registration or licence step.
Ground investigation factual reportThe single record of what was found, hole by hole.
Well decommissioning recordsThey close each well out once monitoring ends.

How is a monitoring well built?

A monitoring well is a cased hole with a slotted screen at the depth you want to sample. A filter pack surrounds the screen, a bentonite seal stops surface water running down the outside, and a lockable cover protects the top. The screen depth decides what the samples can tell you.

Parts of a groundwater monitoring wellMonitoring well cross-section: cover, surface seal, bentonite seal, riser and slotted screen crossing the water table.Lockable coverGas tap (gas wells)Surface sealBackfillBentonite sealPlain riserFilter packWater tableSlotted screenthe response zoneEnd cap
The slotted screen sets which layer a well samples, so its depth is fixed before drilling stops.
Data behind this graphic
PartWhat it does
Lockable coverProtects the well head and stops tampering.
Surface sealStops surface water running down the outside of the casing.
Bentonite sealIsolates the response zone from the ground above it.
Plain riserCarries the sample line up to the surface.
Filter packHolds back fine soil around the screen.
Slotted screenLets groundwater or gas in at the target depth.
End capCloses the base of the casing.
Gas tap (gas wells)Lets ground gas be read without opening the well.

What do we check before drilling?

Three things: what records already exist, what is under the surface, and what the borehole will become. GSI's national borehole database shows the boreholes and site investigations already submitted near your site. Buried services and access are checked on site. A borehole that will supply 25 cubic metres of water a day or more must be registered with the EPA.

Helpful resource: GSI geotechnical data and maps: use this to find existing borehole records near your site before you brief us.

Checks that change the plan

  • If existing GSI logs sit near the site

    then send their references with the brief, because they shape where new holes go.

  • If buried services may be present

    then hole locations are cleared before any rig breaks ground.

  • If access is narrow, low or indoors

    then window sampling or hand-dug pits replace the larger rig.

  • If the ground could be contaminated

    then arisings are sampled and classified before they leave site, through our waste classification team.

  • If the finished borehole will supply 25 m³ or more in a day

    then it goes on the EPA abstraction register, and from 2,000 m³ a day an EPA licence is needed (EPA).

  • If the pumping is a test or an investigation

    then it is a listed exemption under the 2024 Regulations, within the conditions they set (EPA).

  • If a well is no longer needed

    then it is decommissioned and a record is issued.

How does a drilling job run?

Seven steps from brief to report. You send the objective, location, access notes and any existing logs. Verdé fixes the method and hole locations, clears services, mobilises its own crew, drills, logs and samples, installs any wells, then issues the factual report.

  1. Step 1: Brief and existing records

    The objective, Eircode, access notes and any GSI or previous logs.

  2. Step 2: Method and hole plan

    Methods, depths and hole locations are fixed against the objective.

  3. Step 3: Services clearance

    Each location is checked for buried services before ground is broken.

  4. Step 4: Mobilise

    A Verdé crew and rig travel from the nearest base: Kilcoole, Castlebar or Cork.

  5. Step 5: Drill, log and sample

    Each hole is logged as it is drilled, and samples are taken at the agreed depths.

  6. Step 6: Install, develop and survey wells

    Where wells are part of the brief, they are built, developed and surveyed in.

  7. Step 7: Factual report

    Logs, installation records and test data are issued together in one report.

Who drills, and where?

Verdé’s own crews. Rigs and crews work from Kilcoole in Co. Wicklow, Castlebar in Co. Mayo and Cork, covering every county, with Galway appointments by arrangement. New drilling briefs get a reply within one working day.

Verdé field team mobilising equipment on an Irish site.
Crews mobilise from Kilcoole, Castlebar and Cork.
What buyers compare when choosing a drilling contractor
CriterionVerdéWhat it means for you
Methods in-houseCable percussion, rotary, window sampling, trial pitsOne crew can switch method when the ground changes.
WellsGroundwater and ground gas: install, develop, sample, decommissionOne contractor from the first hole to the last sample.
CoverageAll counties, from Kilcoole, Castlebar and CorkCrews start from the nearest of three bases.
Reply timeWithin one working dayScoping starts the day after you send the brief.
Management systemsISO 9001, ISO 14001, ISO 45001Certified quality, environmental and safety systems on site.

Where has Verdé drilled recently?

On jobs from production wells to waste classification. Recent work includes supervising a production well for an anaerobic digester development, fourteen trial pits for a soil classification for Collen Construction, and a hydrogeological site investigation for a proposed cemetery.

Questions about site investigation drilling

Still have a question? Call 01 201 1260 or email info@verde.ie.

Who does site investigation drilling in Ireland?

Verdé does, with its own rigs and crews based in Kilcoole, Castlebar and Cork, covering every county. The crews run cable percussion, rotary and window sampling boreholes and trial pits, and finish holes as monitoring, dewatering or abstraction wells. New briefs get a reply within one working day, and the work is run under ISO 9001, 14001 and 45001 systems.

Cable percussion vs rotary drilling: which do I need?

Cable percussion suits soils such as clays, sands and gravels, and recovers soil samples and in-situ tests at set depths. Rotary suits rock, hard strata and deeper or production wells, and recovers rock core or cuttings. Where soils sit over rock, one hole often needs both: cable percussion through the soils, then rotary once it reaches rock. The matcher above gives a first answer.

How deep do site investigation boreholes go in Ireland?

Most geotechnical boreholes in Ireland are 0 to 30 metres deep, according to Geological Survey Ireland’s borehole dataset. Depth follows the question being asked: foundation design, the depth of contamination, or the aquifer a well must reach. Rotary drilling goes deeper than cable percussion or window sampling. Send the investigation objective and the method and depth follow from it.

How much does a site investigation borehole cost in Ireland?

It depends on the method, the depth, the number of holes, site access and the samples and tests needed, so Verdé prices each job from the brief rather than quoting a flat rate. A brief with the Eircode, purpose, access notes and programme dates gets a reply within one working day, with the scope the price is based on.

Do I need to register a borehole with the EPA?

Only if it will supply 25 cubic metres or more in any 24 hours, according to the EPA; at 2,000 cubic metres or more an EPA licence is needed. Abstractions for testing or investigative reasons are a listed exemption under the 2024 Regulations, so test pumping a new hole within the conditions they set needs no registration. Verdé’s yield data then feeds the registration step.

Can an investigation borehole be turned into a monitoring well?

Yes. Once the hole is logged, a slotted screen, filter pack, bentonite seal and protective cover go in so groundwater or ground gas can be sampled later. Verdé installs, develops, samples and decommissions both groundwater and ground-gas wells, so the crew that drilled the hole can also run the monitoring.

What is the difference between a borehole and a trial pit?

A trial pit is dug by excavator, so you see the ground in section and take bulk samples near the surface. A borehole is drilled, so it reaches deeper ground, recovers soil or rock samples at set depths and can be finished as a monitoring well. Most investigations use both: pits for the shallow picture, boreholes for depth.

What happens to the soil that comes out of the hole?

Drilling arisings are part of the site’s spoil and follow the same rules. Where the ground could be contaminated, they are sampled and classified before leaving site, and the classification decides where they can legally go. Verdé’s waste team handles the sampling, classification and paperwork, so drilling and disposal sit on one record.

Should I check existing borehole records before drilling?

Yes. Geological Survey Ireland stores the boreholes and site investigations that industry submits in its National Geotechnical Borehole Database and shows them on its geotechnical viewer (GSI). The borehole records are open data under a CC BY 4.0 licence (GSI dataset). Send any nearby log references with your brief so new holes go where the existing data runs out.

How soon do I get the borehole logs?

Field logs are written on site as each hole is drilled. The factual report then brings the logs, monitoring well records and test pumping data together in one document. Put your design or planning deadline in the brief, so the report date is agreed before the crew mobilises rather than after the last hole.

Sources and further reading

  1. Geotechnical data and mapsGeological Survey Ireland, checked 3 November 2026. The national geotechnical borehole database and its viewer.
  2. Geotechnical Boreholes Ireland (ROI) ITMGeological Survey Ireland via data.gov.ie, checked 3 November 2026. Typical borehole depths and the open data licence.
  3. Do I need to register or apply for a licence?Environmental Protection Agency, checked 3 November 2026. Abstraction thresholds and exemptions for new boreholes.

Read this page in Markdown

What happens when you send a drilling brief

What we ask for

  • Site address or Eircode
  • What the holes are for
  • Number and depth of holes, if known
  • Access notes: width, height, surface, indoors or out
  • Existing logs or GSI references
  • Programme dates