Verdé Environmental Group

Environmental project case studiesTwenty-four years,
nationwide delivery,
one accountable team.

Consultancy, remediation, dewatering and renewable energy commissions delivered the length and breadth of Ireland — each one led by the same multidisciplinary team from first survey to sign-off.

Experience
24+ years
Offices
Three
Disciplines
12
Coverage
Nationwide

Home heating oil spill or fuel leak right now? Don't keep scrolling — we can be moving within the hour.

Case studies

Recent work.

22 projects

Solar PV Commercial – WicklowFeatured
Solar PV2025Co. Wicklow

Solar PV Commercial – Wicklow

Design and installation of a 10.44kWp solar PV system at commercial premises in Wicklow, with hybrid inverters ready for storage batteries later.

Read case study
Construction Dewatering – Profile Park, DublinConstruction Dewatering

2025 · Profile Park, Dublin

Construction Dewatering – Profile Park, Dublin

Water control for the first two phases of a 22-acre, 52MW data centre campus at Profile Park, Dublin, from licensing to compliance monitoring.

Read case study
Construction Dewatering – 137–140 Abbey Street Upper, Dublin 1Construction Dewatering

2025 · Dublin 1

Construction Dewatering – 137–140 Abbey Street Upper, Dublin 1

Dewatering management, regulatory compliance and environmental monitoring for construction works in an urban setting at 137–140 Abbey Street Upper, Dublin 1.

Read case study
Construction Dewatering – Ballymore Craddockstown Developments Limited, KildareConstruction Dewatering

2025 · Naas, Co. Kildare

Construction Dewatering – Ballymore Craddockstown Developments Limited, Kildare

Ongoing construction dewatering with trade effluent treatment for pH and suspended solids on works at Tipper West, Naas, Co. Kildare. Verdé case study, 2025.

Read case study
94kWp Solar PV Commercial – DublinSolar PV

2025 · Dublin city centre

94kWp Solar PV Commercial – Dublin

A 94kWp solar PV system on two roofs 35m up on a Dublin city centre building, with a scheduled crane lift, a G10 switch and linear heat detection.

Read case study
Construction Dewatering – Garda Ops CentreConstruction Dewatering

2024 · Dublin 8

Construction Dewatering – Garda Ops Centre

Deep-well dewatering for a 10m dig on a 7,000m² Dublin 8 site, discharging about 3,000m³ a day under licence to the River Camac for 11 months.

Read case study
Construction Dewatering – Trinity College, DublinConstruction Dewatering

2024 · Trinity College Dublin

Construction Dewatering – Trinity College, Dublin

A discharge licence application and bespoke dewatering for an 8m double-basement dig on a 2,200m² site at the E3 Learning Foundry, Trinity College Dublin.

Read case study
Construction Dewatering – Meta HQ, DublinConstruction Dewatering

2024 · Ballsbridge, Dublin 4

Construction Dewatering – Meta HQ, Dublin

Dewatering in clay and bedrock for a 14m treble-basement dig on a 10,000m² Dublin 4 site, with pH control and over 200 tonnes of sludge removed.

Read case study
Solar PV Residential – Castlebar, MayoSolar PV

2024 · Castlebar, Co. Mayo

Solar PV Residential – Castlebar, Mayo

A 6.2kWp solar PV system on a slate roof in Castlebar, Co. Mayo, with 10kW of battery storage and optimisers to manage shading on the panels.

Read case study
Solar PV Residential – DublinSolar PV

2024 · Dublin

Solar PV Residential – Dublin

An 8.8kWp solar PV system with battery storage on the flat roof of a newly renovated Dublin home, fixed with specialised anchors and optimisers.

Read case study
Oil Spill Residential – WestmeathOil Spill Response

2024 · Co. Westmeath

Oil Spill Residential – Westmeath

Emergency response and full remediation after about 600 litres of kerosene leaked under a Westmeath home, with 180 tonnes of contaminated material removed.

Read case study
Oil Spill Residential – LongfordOil Spill Response

2024 · Co. Longford

Oil Spill Residential – Longford

Kerosene leaked from an underground oil line at a Longford home: floors broken out, foundation walls replaced and residual oil treated. Verdé case study, 2024.

Read case study
Oil Spill Midwestern HospitalOil Spill Response

2024

Oil Spill Midwestern Hospital

Emergency response to a 4,500-litre fuel oil release in a hospital plant room, treating the ground so the physiotherapy department could reopen.

Read case study
Hydrogeological and Appropriate AssessmentHydrogeology & Water

2023

Hydrogeological and Appropriate Assessment

Trial pits, groundwater wells and Appropriate Assessment screening under Article 6 of the Habitats Directive for a proposed cemetery on a greenfield site.

Read case study
Lake Water Quality MonitoringHydrogeology & Water

2023 · Co. Clare and Co. Wicklow

Lake Water Quality Monitoring

Monthly sampling of 19 lakes in Co. Clare and six in Co. Wicklow by boat-trained samplers, for Water Framework Directive monitoring programmes.

Read case study
Groundwater Resources DevelopmentHydrogeology & Water

2023

Groundwater Resources Development

A new production well field for a caravan park: drilling supervision, pumping tests including 3-day tests, and advice on safe yields and treatment.

Read case study
Soil, Geology & Hydrogeology Chapter for EISHydrogeology & Water

2023 · Co. Antrim

Soil, Geology & Hydrogeology Chapter for EIS

Production and monitoring wells, step tests and a 3-day constant rate pumping test for an anaerobic digester plant's groundwater abstraction licence.

Read case study
Soil Waste Classification – Collen ConstructionEnvironmental Consultancy

2023 · Bray, Co. Wicklow

Soil Waste Classification – Collen Construction

14 trial pits 2.0–3.0m deep, soil sampling and waste classification at a redevelopment site in Bray, Co. Wicklow, with advice on handling excavated soil.

Read case study
Environmental ServicesEnvironmental Consultancy

2023 · Terenure, Dublin

Environmental Services

A demolition waste plan, soil waste classification, invasive species and asbestos surveys for a housing site in Terenure, Dublin. Verdé case study, 2023.

Read case study
Phase II Environmental Site AssessmentEnvironmental Consultancy

2023

Phase II Environmental Site Assessment

A Phase II assessment of soil and a nearby stream after process wash water was discharged onto land, with a conceptual site model. Verdé case study, 2023.

Read case study
Environmental Services to Multiple Construction Sites NationwideEnvironmental Consultancy

2023

Environmental Services to Multiple Construction Sites Nationwide

Real-time noise and vibration monitoring, water sampling, waste management and site audits on construction sites, including service areas on the M6 and M9.

Read case study
Ambient Air and Occupational Hygiene MonitoringAir & Occupational Hygiene

2017 · Derry

Ambient Air and Occupational Hygiene Monitoring

Air quality and worker exposure monitoring at a Derry site in 2014 and again in 2017, beside a biomass plant, with real-time particulate monitoring.

Read case study

Where we work

Every county, one team.

Our locations

Verdé offices

Verdé has three staffed offices in Ireland: Kilcoole, Co. Wicklow (head office and laboratory), Castlebar, Co. Mayo, and Cork. Galway is by appointment only, and our Lagos office serves work in Nigeria. Each is mapped from its published address. Select a location to view it on the map, or enter a full Eircode above to mark your site and identify the nearest team.