Verdé Environmental Group

Contaminated land in Ireland: find it, assess it, fix it

Phase I to validation sign-off for soil, groundwater, surface water and buildings, from a team that has handled over 6,000 oil spill projects.

Emergency, 24/7

Oil or fuel escaping now?

Call 0818 714 002 and a crew is mobilised the same day.

Get help now

Planned work

Buying, selling, redeveloping or answering a planning condition?

Start with the site model.

Build your site model
Site personnel in full protective equipment during a Verdé environmental works programme.

Last updated

Key takeaways

  • Contamination is a risk only where a source, a pathway and a receptor link up.
  • The EPA's approach runs in three stages: assess, design the fix, then deliver and verify it.
  • Verdé covers soil, groundwater, surface water and buildings, from Phase I desk study to validation.
  • Verdé has handled over 6,000 oil spill projects for the insurance market.
  • Oil escaping now? Call 0818 714 002 first; assessment follows containment.

Verdé assesses and remediates contaminated land across Ireland, from the first Phase I desk study to the validation report that signs a site off. The work covers soil, groundwater, surface water and buildings, follows the source, pathway and receptor approach set out by the EPA, and draws on over 6,000 oil spill projects for the insurance market.

This page is for assessing and cleaning up pollution in ground, water and buildings. A live oil or fuel leak goes to the 24/7 spill team, asbestos goes to asbestos surveys and testing, and soil classification for a muck-away goes to waste management. All of it sits within our environmental consultancy practice.

Is this right for you?

This is a fit if

  • You are buying, selling or financing land with a polluting history.
  • You are redeveloping brownfield land or answering a planning condition on contamination.
  • A past oil or fuel leak needs assessment, clean-up and a sign-off report.
  • An EPA-licensed site needs contaminated land reporting to the EPA templates.

This is not a fit if

If it is not a fit, the three links above are the right doors, and the 24/7 line answers any spill.

How do you know if land is contaminated?

You find out in layers. A desk study and walkover build a conceptual site model of the possible sources, pathways and receptors, and sampling then tests whether any linkage is real. The EPA puts the conceptual site model at the centre of its contaminated land approach.

Site Model Builder

Pick what might be on your site and the drawing lights up the links. Nothing is stored or sent.

1. Source
2. Pathways
3. Receptors
How contamination reaches people and waterOil from a garden tank moving through soil to groundwater, a well and a river, with vapour rising into the house.Water tableRiverOil tankHousePeoplePrivate wellNeighboursContactLeachingGroundwater flowVapourRun-off
A pollutant is a risk only where a source, a pathway and a receptor connect; break one link and that risk stops. Source: EPA contaminated land guidance, checked 19 October 2026.

Choose a source, then the pathways and receptors you are worried about.

Data behind this graphic
LinkageExampleWhat breaks it
Leaching to groundwaterOil soaking down to the water tableRemove the source soil or treat the groundwater
Vapour into buildingsFumes rising through a floor slabRemove the source, seal or ventilate the building
Run-off to surface waterOil washing into a drain or streamContain at source and block the drain
Direct contactPeople touching soil or breathing its dustRemove, cover or cap the soil
How the builder links pathways to receptors
Pathways and the receptors each one can reach
PathwayReceptors it can reach
Direct contact with soil or dustPeople on the site
Leaching down to groundwaterA private well or water supply; a river, stream or lake fed by groundwater
Vapour rising into buildingsPeople on the site; neighbours; the building fabric
Run-off into drains or surface waterA river, stream or lake

How this works: the source, pathway and receptor test from the EPA contaminated land approach. It lists linkages to investigate, not findings.

What are the stages, from first look to sign-off?

The EPA guidance runs in three stages. Stage 1 characterises and assesses the site, Stage 2 appraises and designs the corrective action, and Stage 3 delivers it and verifies the result. Verdé's Phase I to III reports, risk assessments, strategy and validation report follow the same order.

  1. 1

    Stage 1

    site characterisation and assessment

    1. 1

      Preliminary site assessment

      A Phase I desk study and walkover, and a first site model.

    2. 2

      Detailed site assessment

      A Phase II intrusive investigation and sampling, with drilling where boreholes are needed.

    3. 3

      Quantitative risk assessment

      Human health and controlled waters, against criteria for the real receptors.

  2. 2

    Stage 2

    corrective action feasibility and design

    1. 4

      Options appraisal and remediation strategy

      The options are compared, and the chosen fix is designed and agreed.

  3. 3

    Stage 3

    implementation and verification

    1. 5

      On-site remediation delivery

      The strategy is carried out on site.

    2. 6

      Validation and closure report

      Sampling evidence shows the agreed targets were met.

At EPA-licensed sites, the EPA publishes report templates for each stage, and Verdé reports to them.

What changes the plan

  • If oil is still escaping

    then call 0818 714 002 first; investigation starts after containment.

  • If the site holds an EPA licence

    then reports follow the EPA contaminated land templates.

  • If soil will leave site

    then it is classified as waste first, unless it qualifies as a by-product, through our waste team.

  • If groundwater may be affected

    then monitoring wells and a controlled-waters assessment are added, with hydrogeology input.

  • If oil or vapour has reached a building

    then the building fabric and indoor air are assessed alongside the ground.

  • If the site is in Dublin City and being redeveloped

    then remediation comes before redevelopment (Dublin City Council).

  • If a sale, planning or claim deadline applies

    then put the date in the brief, so the programme is set around it.

What must remediation achieve in soil, water and buildings?

Remediation targets the linkage, not the chemical. It must break or weaken each risky source, pathway and receptor link found in Stage 1, then prove it with sampling. The same test applies to soil, groundwater, surface water and building fabric.

What success looks like in each affected medium
MediumReceptor usually at riskWhat success looks likeHow it is proven
SoilPeople using the site; groundwater belowRisk to users and water within the agreed criteriaValidation sampling against the criteria in the strategy
GroundwaterWells, springs and rivers fed by groundwaterConcentrations falling to agreed targets at agreed pointsMonitoring well results over an agreed period
Surface waterRivers, streams, lakes and drainsNo continuing input from the siteWater sampling and inspection of the pathway
BuildingsOccupants (vapour, odour) and the fabric itselfIndoor conditions back to the agreed standardIndoor air or surface sampling after the works

Who asks for a contaminated land assessment, and why?

Four groups, four triggers. Buyers and lenders want liabilities known before a sale, planning authorities want brownfield land made safe before building, insurers need escape-of-oil claims assessed and closed, and the EPA needs licensed sites managed to its guidance. Dublin City's development plan requires remediation before redevelopment.

Why contaminated land assessments get commissioned
TriggerWho asksWhat they needRead more
Property sale or purchaseBuyers, lenders, fundsLiabilities known before contractsCommercial and industrial
RedevelopmentPlanning authorityRemediation before buildingConstruction
Escape-of-oil claimInsurer, loss adjusterAssessment, clean-up, validationInsurance
EPA-licensed siteEPAReports to the EPA templatesEPA licensing
Fuel stations and terminalsOperatorInvestigation and monitoringPetrochemical
What to compare when choosing a contaminated land specialist
CriterionVerdéWhat it means for you
Track recordOver 6,000 oil spill projects across 24 yearsHomes, hospitals, farms, forecourts and rivers are all familiar ground.
Media coveredSoil, groundwater, surface water, buildingsOne team for every pathway on the site.
Emergency cover24/7 line; crews mobilised the same dayContainment starts before the assessment.
Field capabilityIn-house drilling, sampling and monitoring; HQ and laboratory in KilcooleInvestigation, monitoring and clean-up sit with one firm.
ReportingPhase I to III, risk assessment, strategy, validationEvery stage documented for regulator, buyer or insurer.

What has Verdé cleaned up?

Spills and sites of every size. Verdé's record includes over 600 litres of kerosene that spread beneath a house in Westmeath, 4,500 litres of light fuel oil in a hospital plant room, and Phase II investigations sampling soil to measure the impact of a discharge.

  • 2024

    • Over 600 litres of kerosene escaped from a leaking storage tank.
    • Oil migrated to neighbouring land and beneath the insured house.
    • Odours inside, with the septic tank and percolation area affected.
  • 2024

    • 4,500 litres of light fuel oil from a fractured fuel line in a plant room.
    • The adjoining physiotherapy room was affected and the department had to close.
  • 2023

    • Representative soil and water samples, to assess the impact of a process wash water discharge on nearby land and a stream.
    • A Phase II report with trial pit logs and water sampling logs, and a conceptual site model.
Verdé oil spill response equipment, part of the kit the company has used since 2015.
Spill response equipment has been part of the Verdé toolkit since June 2015.

Questions about contaminated land

Still have a question? Call 01 201 1260 or email info@verde.ie.

Who does contaminated land assessment in Ireland?

Verdé does, from the Phase I desk study through to the validation report, for soil, groundwater, surface water and buildings. The team works from Kilcoole, Castlebar and Cork with its own drilling and sampling crews, has handled over 6,000 oil spill projects for the insurance market, and replies to new enquiries within one working day.

What is a Phase 1 environmental site assessment in Ireland?

A Phase I is a desk study and site walkover. It pulls together historical maps, past uses, tanks, drainage, geology and nearby receptors into a first conceptual site model, so you know whether contamination is plausible before anyone digs. Verdé's Phase I leads into a Phase II investigation only where the model shows a linkage worth testing.

Heating oil leaked into my garden: what do I do?

Call the 24/7 spill line on 0818 714 002 before anything else, and keep oil out of drains if you can do so safely. Oil travels through soil, drains and groundwater, and can reach under a house and onto neighbouring land, as it did in a Westmeath case with over 600 litres of kerosene. Assessment and clean-up follow containment.

Do I need soil testing before building on a brownfield site in Ireland?

In Dublin City, the development plan requires contaminated sites to be remediated to internationally accepted standards before redevelopment, so testing comes first (Dublin City Council). Elsewhere, read the planning conditions and the development plan for your area. Verdé starts with a Phase I desk study, so the planning submission shows what the site holds and how it will be dealt with.

What environmental due diligence do I need before buying an industrial site?

Start with a Phase I desk study and walkover, which shows whether contamination is plausible from past uses, tanks and drainage. Where it is, a Phase II samples the ground before contracts are signed, so the liability is priced rather than inherited. Buyers and lenders use the reports in negotiation, and the same team can carry the site through to validation.

What does a quantitative risk assessment show?

A quantitative risk assessment compares measured concentrations with criteria set for the real receptors on and around your site. Verdé assesses two kinds: human health, for the people who will use the land, and controlled waters, for groundwater and surface water. The result decides whether remediation is needed and what it has to achieve.

What is a validation report?

A validation report proves that remediation reached its agreed targets, using sampling evidence from the finished works. It is the document a regulator, buyer, lender or insurer asks for at sign-off. Verdé issues a validation and closure report at the end of remediation, matching the verification step in the EPA's Stage 3 template.

Do you deal with my insurer on an oil spill claim?

Yes. Verdé has provided oil spill investigation, remediation and clean-up to the insurance market for over 24 years and has handled over 6,000 oil spill projects, from homes to hospitals. The team contains the spill, cleans it up and deals with your insurer directly, so you are not relaying messages between them.

Can contaminated soil be taken off site?

Only once it is classified. Excavated soil leaving a site is waste unless it qualifies as a by-product, and its classification under the List of Waste decides which authorised facility can accept it (EPA, 2019). Verdé's waste team samples, classifies and documents the soil, so the remediation record and the disposal record match.

Sources and further reading

  1. Management of Contaminated Land and GroundwaterEnvironmental Protection Agency, checked 19 October 2026. The risk-based method and its three stages.
  2. Management of Contaminated Land & Groundwater at EPA Licenced SitesEnvironmental Protection Agency, checked 19 October 2026. The report template for each stage.
  3. Development plan, 9.5.6 Soil RemediationDublin City Council, checked 19 October 2026. Remediation before redevelopment.
  4. Waste Classification: List of Waste and determining if waste is hazardous or non-hazardousEnvironmental Protection Agency, 2019. How excavated soil is classified.

Read this page in Markdown

What happens when you send a contaminated land enquiry

What we ask for

  • Site address or Eircode
  • What happened, or what the site was used for
  • Any existing reports
  • The proposed use
  • Any sale, planning or claim deadline
  • Whether oil is still escaping: if yes, call 0818 714 002 now

Reply

Within one working day; regulatory or emergency incidents get crews the same day.

Phone 01 201 1260 or email info@verde.ie