Solar panels for homes in Ireland: the grant, the steps and the install

Verdé designs and installs solar panels and batteries for homes, businesses and farms as an SEAI-registered solar PV company, from the roof survey to the grant paperwork and the notice to ESB Networks.

Last updated

Solar panels, or solar PV, turn daylight into electricity for the home, and a battery stores what is not used straight away. In Ireland, SEAI pays a grant of up to €1,800 for the panels and €600 for a battery, for homes built and first lived in before 2025, and panels supplied and installed on a home have no VAT. Verdé designs and installs systems as a company on SEAI’s solar PV register.

This page is for homeowners, and for businesses and farms putting solar panels on their own roofs. It is not about solar farms or grid-scale projects: our renewable energy sector page covers planning for those.

Key takeaways

  • The SEAI grant is €700 per kWp up to 2 kWp and €200 per extra kWp up to 4 kWp, capped at €1,800; a battery adds €600, so up to €2,400.
  • Homes with an MPRN, built and first lived in before 2025, qualify once; the grant offer must be in place before any work starts.
  • Solar panels supplied and installed on a home have had 0% VAT since 1 May 2023.
  • Since October 2022 there is no planning limit on rooftop solar panels on a house, subject to conditions such as distances from the roof edge.
  • Verdé is on SEAI’s list of solar PV companies as Verde Remediation Services Ltd, registration 50338.

Is this right for you?

This is a fit if

  • You want solar panels, or panels and a battery, on your home.
  • You want to know what the SEAI grant would be before you get quotes.
  • You run a business or farm and want to power it with its own solar panels.
  • You want one company to survey the roof, design the system, install it and handle the grant paperwork.

This is not a fit if

  • You want a solar farm on open land: see our renewable energy page.
  • You only need a BER certificate.

For a solar farm or a grid connection study, our renewable energy sector page sets out the planning tests. For a BER on its own, use an SEAI-registered BER assessor.

How much is the solar panel grant in Ireland?

Up to €1,800 for the panels: €700 per kWp for the first 2 kWp and €200 for each extra kWp up to 4 kWp. A battery of 5 kWh or more adds €600, so up to €2,400 in all. Homes on qualifying welfare payments can get an enhanced grant of up to €9,000 with a battery.

The SEAI solar panel grant by system sizeSEAI solar grant by size: €700 at 1 kWp, €1,400 at 2 kWp, €1,600 at 3 kWp and €1,800 at 4 kWp; a battery adds €600.€0€600€1,200€1,800€2,400€700€1,3001 kWp€1,400€2,0002 kWp€1,600€2,2003 kWp€1,800€2,4004 kWpno more after 4 kWpPanel grantBattery grant, €600
The grant rises steeply to 2 kWp, slowly to 4 kWp and then stops: a bigger system gets the same €1,800 for the panels. A battery of 5 kWh or more adds €600. Source: SEAI.
Data behind this graphic: the SEAI solar panel grant by system size
System sizePanel grantWith a battery
1 kWp€700€1,300
2 kWp€1,400€2,000
3 kWp€1,600€2,200
4 kWp or more€1,800€2,400

Solar grant check

When the home was built, any earlier grant, the system size and a battery. Nothing is stored or sent.

1. When was the home built and first lived in?
2. Has SEAI funded solar panels at this MPRN before?

Answer the questions to see the grant for this home.

How the solar grant check decides
How the solar grant check decides
IfThen
The home was built or first lived in from 2025No SEAI solar PV grant
SEAI has already funded solar PV at this MPRNNo second solar PV grant
Up to 2 kWp€700 per kWp
From 2 to 4 kWp€200 for each extra kWp, with the panel grant capped at €1,800
A battery of 5 kWh or more€600 more, so up to €2,400 in all
A qualifying welfare payment, such as Fuel Allowance€3,350 per kWp up to 2 kWp and €850 per extra kWp up to 4 kWp, capped at €8,400, or €9,000 with a battery

The figures and rules come from SEAI’s solar electricity grant page, read on 26 November 2026. SEAI decides every application and confirms the amount in the grant offer.

The enhanced grant for homeowners on a qualifying welfare payment
SystemEnhanced grantStandard grant
2 kWp€6,700€1,400
3 kWp€7,550€1,600
4 kWp or more€8,400€1,800
With a battery of 5 kWh or more€600 more, up to €9,000€600 more, up to €2,400

The qualifying payments include Fuel Allowance, Working Family Payment, One-Parent Family Payment and Domiciliary Care Allowance, and SEAI checks them with the Department of Social Protection. Homes with a long-term tenant on a Rental Accommodation Scheme payment through one of the four Dublin councils can get up to €9,000 (SEAI).

The solar grant in full, and the other grants your home could get

Our grants page for home solar sets out SEAI’s figures, who qualifies and how to apply, with the date we last checked them. The checker asks a few questions about your home and shows which other grants fit, such as solar water heating and insulation.

Check your home’s grants

Who can get the SEAI solar panel grant?

Homeowners, including private landlords, owner management companies and approved housing bodies, for a home with an MPRN that was built and first lived in before 2025. SEAI pays the solar PV grant once for each MPRN, so a home that has had it before does not qualify again.

The rules SEAI sets

  • Create the grant application and wait for the offer before any work starts; you then have 8 months to finish and send the paperwork (SEAI).
  • The work must be done by a company on SEAI’s solar PV register (SEAI register).
  • A post-works BER is part of the claim.
  • If you add the battery later, it is a separate application; installations that have already started cannot be accepted.

Is there VAT on solar panels?

No, for a home. Since 1 May 2023, solar panels supplied and installed on or beside a private home have a zero rate of VAT, including the battery and wiring in the same contract. Panels bought without installation carry the standard rate (Revenue).

How do you get solar panels with the SEAI grant?

In SEAI’s seven steps: choose a registered solar PV company and get quotes, apply for the grant offer, get ready before the work starts, install the system, arrange the post-works BER, send SEAI the evidence, and SEAI pays the grant, sometimes after an inspection.

The seven steps, from quote to payment

  1. Choose a registered company and get quotes

    SEAI pays only for work by a company on its solar PV register, and advises getting several quotes.

  2. Apply for the grant offer

    Apply online with the MPRN from your electricity bill. Panels and a battery go in one application.

  3. Before the work starts

    Wait for the offer. The installer tells ESB Networks about the system on an NC6 or NC7 form.

  4. Install the system

    Panels, inverter, any battery, and the wiring and isolation the system needs.

  5. Arrange the post-works BER

    A BER assessor records the home with the new system.

  6. Send SEAI the evidence

    The completion paperwork goes to SEAI within the 8 months of the offer.

  7. SEAI pays

    SEAI pays the grant, and may inspect the installation first.

What size of solar system does a home need?

It depends on the roof and on how much electricity the home uses, and when. System size is measured in kWp, the output in full sun. The grant counts up to 4 kWp, but many homes fit more: the two homes we installed in 2024 have 6.2 kWp and 8.8 kWp.

A well-oriented, unshaded roof in Ireland produces roughly 850 to 950 kWh a year for each kWp installed, and orientation, tilt and shading move that figure. Our solar yield guide shows how we work it out for a roof.

What we look at on the survey

  • Which way the roof faces, its pitch, and what shades it at different times of the year.
  • The roof covering and its condition: slate, tile or a flat roof each need different fixings.
  • How much electricity the home uses, and whether most of it is in the evening.
  • Whether the supply is single phase or three phase, which decides the ESB Networks form.
  • Where the inverter and any battery can go, and the cable route between them.

Should you add a battery to solar panels?

A battery stores the electricity the panels make during the day for use after dark, instead of exporting it. SEAI pays €600 towards a battery of 5 kWh or more, and it can go in the same application as the panels or be added later in a separate one.

Whether it suits a home depends on when the household uses its electricity. A home that is empty during the day and busy in the evening stores more of its own power with a battery; one that uses most of its power in the daytime sends less back to the grid in the first place. Both of our 2024 home installations have battery storage.

Can you get paid for the electricity you export?

Yes. Your installer tells ESB Networks about the system on an NC6 form, or an NC7 form for a larger system, and ESB Networks tells your supplier. With a smart meter, the supplier then pays for every unit you export, usually as a credit on your bill.

The NC6 form is for systems up to 6 kW on a single-phase supply or 11 kW on three-phase; above that, up to 50 kW, the NC7 form applies. Your bill shows the units exported and the rate paid for each, under the Clean Export Guarantee arrangements the CRU published in June 2024 (CRU).

Do you need planning permission for solar panels on a house?

Usually not. Since 5 October 2022 there has been no limit on rooftop solar panels on a house, inside or outside the solar safeguarding zones around airports. Conditions still apply, such as distances from the edge of the roof, and different rules cover protected structures and Architectural Conservation Areas.

The safeguarding zones limit rooftop panels on other buildings, not houses, to 300 square metres for each roof. If the house is a protected structure or stands in an Architectural Conservation Area, check with the planning authority before any panels go up (Department of Housing). A solar farm on open land is a different matter: our renewable energy page sets out its planning tests.

How does Verdé install solar panels?

We survey the roof, design the system around the home’s use, quote, help with the grant application, notify ESB Networks, install the panels, inverter and any battery, commission the system and hand over the paperwork for the grant claim. We are on SEAI’s list of solar PV companies.

  1. Roof survey and design

    Orientation, pitch, shading and roof type, and a system sized for how the home uses electricity.

  2. Quote and grant application

    A written quote, and help with the SEAI application so the offer is in place before work starts.

  3. ESB Networks notice

    We send the NC6 or NC7 form for the system.

  4. Installation

    Panels, inverter, battery and isolation, with fixings chosen for the roof, from slate to flat roofs.

  5. Commissioning and handover

    The system tested and explained, with the documents for the BER and the grant claim.

Registered with SEAI

Our remediation company, Verde Remediation Services Ltd, is on SEAI’s list of registered solar PV companies, registration 50338, for homes and businesses in every county (SEAI). For a whole-home upgrade with insulation and a heat pump, see our home retrofit page.

Two of our home solar installations

What about solar panels for businesses and farms?

Businesses, farms, schools and community buildings can get SEAI’s non-domestic solar grant, set by system size from €1,800 for 1 kWp up to €325,200. Farms can instead use the Solar Capital Investment Scheme: 60% of up to €90,000 of investment. We have installed 10.44 kWp for a Wicklow business and 94 kWp on a Dublin city centre building.

The non-domestic grant covers businesses, the agricultural sector, public bodies, schools, community centres and non-profits (SEAI). The farm scheme needs at least 5 hectares declared under BISS, or 20 production units for intensive enterprises (Department of Agriculture). Only one grant can fund the same system. Our agriculture and commercial and industrial pages cover the other environmental work those sites need.

Two of our commercial solar installations

  • Commercial solar PV

    2025, Co. Wicklow

    • A 10.44 kWp system designed and installed for a commercial premises
    • Hybrid inverters ready for storage batteries later
  • 94 kWp solar PV on a city centre building

    2025, Dublin

    • Two roofs 35 metres up, with materials lifted by a scheduled crane
    • 440 W modules, dual hybrid inverters, a G10 switch and linear heat detection

What do the solar terms mean?

Seven terms come up in every solar quote and grant application. Knowing them makes it easier to compare quotes and to see what the installer, SEAI and ESB Networks are asking for.

kWp
Kilowatt peak: what a solar system produces in full sun under standard test conditions. The grant is set per kWp.
Inverter
Turns the direct current from the panels into the alternating current the home uses.
Hybrid inverter
An inverter that also manages a battery.
MPRN
The Meter Point Reference Number on your electricity bill. SEAI pays one solar PV grant per MPRN.
NC6 form
The form your installer sends ESB Networks for a system up to 6 kW single phase or 11 kW three phase.
Export
Electricity your panels send to the grid when the home is not using it. Suppliers pay for it.
Post-works BER
The Building Energy Rating done after the installation, as part of the grant claim.

Solar panel questions we are asked most

Still have a question? Call 01 201 1260 or email info@verde.ie.

How much is the solar panel grant in Ireland?

SEAI pays €700 per kWp for the first 2 kWp and €200 for each extra kWp up to 4 kWp, so the panel grant is capped at €1,800. A battery of 5 kWh or more adds €600, so up to €2,400 in all. Homeowners on a qualifying welfare payment can get an enhanced grant of up to €8,400, or €9,000 with a battery.

Who qualifies for the SEAI solar grant?

Homeowners, including private landlords, owner management companies and approved housing bodies, for a home with an MPRN that was built and first lived in before 2025. SEAI pays the solar PV grant once per MPRN. The offer must be in place before any work starts, and the work must be done by a company on SEAI’s solar PV register.

Do I need planning permission for solar panels on my house?

Usually not. Since 5 October 2022 there has been no limit on rooftop solar panels on a house, inside or outside the solar safeguarding zones around airports. Conditions still apply, such as minimum distances from the edge of the roof, and a protected structure or a house in an Architectural Conservation Area needs a check with the planning authority first.

Is there VAT on solar panels in Ireland?

Not on a home. Since 1 May 2023, solar panels supplied and installed on or beside a private home have a zero rate of VAT, including the battery and wiring in the same contract. Panels bought on their own, without installation, carry the standard rate, and the zero rate does not cover commercial buildings or short-stay accommodation.

Can I get paid for the electricity my solar panels export?

Yes. Your installer tells ESB Networks about the system on an NC6 or NC7 form, ESB Networks tells your supplier, and with a smart meter the supplier pays for every unit you export, usually as a credit on your bill. The bill shows the units exported and the rate paid for each, under the Clean Export Guarantee arrangements the CRU published in June 2024.

Is there a grant for a solar battery?

Yes. SEAI pays €600 towards a battery of 5 kWh or more, on top of the panel grant, so a home can get up to €2,400 for panels and a battery together. Both can go in one application, or the battery can be added later in its own application, as long as the installation has not already started.

Is Verdé an SEAI-registered solar installer?

Yes. Verde Remediation Services Ltd, part of Verdé Environmental Group, is on SEAI’s list of registered solar PV companies, registration number 50338, for homes and businesses in every county. SEAI pays its solar PV grant only for work by a company on that list, so the grant can be claimed on a system we install.

What size solar system gets the full grant?

A system of 4 kWp gets the full €1,800 panel grant. The grant is paid pro rata on the size, €700 per kWp up to 2 kWp and €200 per kWp from 2 to 4 kWp, so a 2.5 kWp system gets €1,500. A system bigger than 4 kWp still qualifies, but the panel grant stays at €1,800.

Sources and further reading

  1. Solar electricity grant (solar PV)SEAI, checked 26 November 2026. The grant per kWp and its €1,800 cap, the €600 battery grant, who qualifies, the enhanced grant and the seven steps.
  2. Solar PV companiesSEAI, checked 26 November 2026. Verde Remediation Services Ltd is a registered solar PV company, registration 50338, for homes and businesses in every county.
  3. Supply and installation of solar panelsRevenue, checked 23 November 2026. The zero rate of VAT since 1 May 2023 for solar panels supplied and installed on or beside a private home.
  4. Solar planning exemptionsDepartment of Housing, Local Government and Heritage, checked 26 November 2026. No rooftop limit on houses since 5 October 2022, the conditions that still apply, and the solar safeguarding zones.
  5. MicrogenerationCommission for Regulation of Utilities, checked 26 November 2026. The NC6 and NC7 forms the installer sends to ESB Networks, and how suppliers pay for exported electricity.
  6. Non-domestic solar PV grantSEAI, checked 26 November 2026. The grant set by system size for businesses, farms, schools, community centres and public buildings: an effective 45% for new applications from 6 October 2026 to 6 July 2027.
  7. Solar Capital Investment SchemeDepartment of Agriculture, Food and the Marine, checked 23 November 2026. A 60% grant towards solar panels and batteries that power a farm, on up to €90,000 of investment per holding.

Read this page in Markdown

Ask about solar panels for your roof

What we ask for

  • The address or Eircode of the building
  • Roughly how much electricity you use, from a recent bill
  • Whether you want a battery as well
  • Anything you know about the roof: which way it faces, what covers it and what shades it