Environmental Consultancy · Case study
Environmental Services to Multiple Construction Sites Nationwide
Real-time noise and vibration monitoring, water sampling, waste management and site audits on construction sites, including service areas on the M6 and M9.

Project narrative
Real time noise and vibration monitoring at site boundaries or at sensitive neighbouring properties.
Management of environmental requirements to include surface water sampling , waste management , site audits etc.
Verde Environmental Consultants are managing the environmental requirements for several construction sites throughout the country including:
Ballymore Eustace Water Treatment Plant (on behalf of Irish Water)
Circle K Motorway Service Station development sites in Athlone (M6) and Kilcullen (M9) (on behalf of Killeen Civil Engineering )
Keep reading
Related case studies
Environmental Consultancy
Soil Waste Classification – Collen Construction
14 trial pits 2.0–3.0m deep, soil sampling and waste classification at a redevelopment site in Bray, Co. Wicklow, with advice on handling excavated soil.
Environmental Consultancy
Environmental Services
A demolition waste plan, soil waste classification, invasive species and asbestos surveys for a housing site in Terenure, Dublin. Verdé case study, 2023.
Environmental Consultancy
Phase II Environmental Site Assessment
A Phase II assessment of soil and a nearby stream after process wash water was discharged onto land, with a conceptual site model. Verdé case study, 2023.
