# Hydrogeology in Ireland: abstraction, models, protection, monitoring

25m³ a day

The EPA registration threshold for water abstraction.

2,000 m³ a day needs a licence.

Last updated 3 November 2026

![Verdé groundwater resource work, the service it added in October 2012.](https://verde.ie/__l5e/assets-v1/5b1bdc49-08d5-4208-ab5b-ea6926f7dfc6/verde-story-7.jpg)

Verdé's hydrogeology consultants help Irish sites work out whether their water use must be registered or licensed with the EPA, and build the evidence behind the answer: source characterisation, yield testing and impact assessment. The same team builds numerical groundwater models, delineates drinking-water source protection zones and runs telemetered monitoring networks.

Hydrogeology here means assessing, modelling and monitoring groundwater and surface water in Ireland. Drilling the boreholes sits on [site investigation drilling](https://verde.ie/services/drilling), and keeping an excavation dry sits on [construction dewatering](https://verde.ie/services/construction-dewatering). Both feed the wider [environmental consultancy](https://verde.ie/services/environmental-consultancy) service. Coastal and tidal waters fall outside the abstraction rules.

## Key takeaways

- Abstracting 25 m³ (25,000 litres) of water a day or more means registering with the EPA.
- At 2,000 m³ a day or more, an abstraction needs an EPA licence.
- Testing, investigation, firefighting and temporary works abstractions are listed exemptions.
- GSI maps rate groundwater vulnerability at every site, from X and E (extreme) to L (low).
- Verdé builds abstraction dossiers, groundwater models, source protection zones and telemetered monitoring networks.

## Is this right for you?

### This is a fit if

- You abstract, or plan to abstract, 25 m³ of water a day or more and need the EPA registration or licence dossier.
- A quarry, landfill, dewatering scheme or data centre needs a groundwater model.
- A drinking-water source needs a protection zone or a Water Framework Directive assessment.
- A site needs continuous level, flow or quality monitoring with telemetry.

### This is not a fit if

- You run a domestic well for one house: it is a listed exemption from registration.
- You only need a borehole drilled: go to [drilling](https://verde.ie/services/drilling).
- Your excavation is flooding now: go to [construction dewatering](https://verde.ie/services/construction-dewatering).

If it is not a fit, the links above are the right teams.

## Do you need to register or license your water abstraction?

Volume decides it, measured over any 24 hours. Under 25 m³ a day needs neither registration nor a licence; 25 m³ or more must be registered with the [EPA](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/); 2,000 m³ or more needs an EPA licence. Between the two, the EPA assesses whether a licence is needed. The regime started on 28 August 2024 ([EPA](https://epa.ie/our-services/licensing/freshwater--marine/water-abstraction)).

**Thresholds and exemptions the checker uses**

Table: Rules behind the Abstraction Checker

| If | Result | Source |
| --- | --- | --- |
| The source is coastal or tidal water | Outside the 2022 Act: no registration or licence | [EPA FAQs](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/faqs-on-water-abstraction-and-associated-impoundment-regulation/) |
| Drinking water for one house | Listed exemption: no registration | [S.I. 419 of 2024](https://www.irishstatutebook.ie/pdf/2024/en.si.2024.0419.pdf) |
| Test pumping, investigation, temporary works or firefighting | Listed exemption from registration, within the conditions in the 2024 Regulations | [EPA](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/), [S.I. 419 of 2024](https://www.irishstatutebook.ie/pdf/2024/en.si.2024.0419.pdf) |
| Under 25 m³ in any 24 hours | No registration or licence; Part 2 of the 2024 Regulations still applies | [EPA](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/) |
| 25 to 1,999 m³ in any 24 hours | Register with the EPA, free, through EDEN; the EPA then assesses whether a licence is needed | [EPA FAQs](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/faqs-on-water-abstraction-and-associated-impoundment-regulation/) |
| 2,000 m³ or more in any 24 hours | An EPA licence is required | [EPA](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/) |

How this works: thresholds and exemptions from the EPA abstraction guidance and the 2024 Regulations. The EPA makes the final decision on any abstraction.

### What changes the answer

- **If the source is coastal or tidal water**: then the 2022 Act does not apply and no registration or licence is needed.
- **If the abstraction is under 25 m³ a day**: then no registration or licence is needed, but the general rules in Part 2 of the 2024 Regulations still apply unless it is exempt.
- **If the abstraction is 25 m³ or more in any 24 hours**: then register it with the EPA through EDEN; registration is free.
- **If it is 2,000 m³ or more in any 24 hours**: then it needs an EPA licence; existing abstractions at that level had until 28 February 2025 to apply unless the EPA extended it.
- **If it sits between 25 and 1,999 m³ a day**: then the EPA assesses it to decide whether a licence is needed.
- **If it supplies drinking water to one house, is a test or investigation, fights a fire or is a temporary abstraction for works**: then it is a listed exemption.
- **If a new or increased abstraction is registered**: then it cannot start until the EPA authorises it ([EPA FAQs](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/faqs-on-water-abstraction-and-associated-impoundment-regulation/)).

Helpful resource: [EPA water abstraction guidance](https://epa.ie/our-services/licensing/freshwater--marine/water-abstraction): use this to register an abstraction or start a licence application.

## What do the GSI maps say about your site?

Two things: how vulnerable the groundwater is, and how much the aquifer matters. Geological Survey Ireland rates vulnerability from X and E (extreme) through H (high) and M (moderate) to L (low), by combining the depth, type and permeability of the subsoil ([GSI](https://data.gov.ie/dataset/groundwater-vulnerability-140000-ireland-roi-itm/resource/1b156eee-82ae-4b3e-acb4-0c88e6c34cf1)). It also ranks aquifers as regionally important, locally important or poor ([GSI](https://gsi.ie/data-and-maps/groundwater-inside-data-and-maps/)).

**Figure: Groundwater vulnerability categories in Ireland.** Five ground columns from X to L: pollution reaches groundwater fast through thin cover and is held back by thick clay.

The thinner and more permeable the cover over the rock, the faster a spill reaches groundwater, which is why GSI's categories run from X to L. Source: [Geological Survey Ireland vulnerability data, checked 19 October 2026](https://data.gov.ie/dataset/groundwater-vulnerability-140000-ireland-roi-itm/resource/1b156eee-82ae-4b3e-acb4-0c88e6c34cf1).

Table: Data behind this graphic

| Category | GSI description | What sets it |
| --- | --- | --- |
| X | Extreme: rock at or near the surface, or karst | Little or no subsoil; karst features such as swallow holes |
| E | Extreme | Thin subsoil over rock, or a water table close to the surface in sand and gravel aquifers |
| H | High | Subsoil depth, type and permeability combined in GSI's matrix |
| M | Moderate | Subsoil depth, type and permeability combined in GSI's matrix |
| L | Low | Groundwater well protected by the subsoil layers |

Helpful resource: [GSI groundwater data and maps](https://gsi.ie/data-and-maps/groundwater-inside-data-and-maps/): use this to look up the aquifer and vulnerability category under your site before you brief us.

## What can a groundwater model tell you?

How groundwater will respond before you change it. Verdé's groundwater modelling team builds numerical models for construction dewatering, quarry deepening, landfill risk and source protection zoning, so drawdown, flow paths and the land that feeds a source can be tested on screen before anything is pumped or dug.

Table: What each groundwater model is built to answer

| Use | The question the model answers | What it feeds |
| --- | --- | --- |
| [Construction dewatering](https://verde.ie/services/construction-dewatering) | How far will pumping lower groundwater around the dig? | Dewatering design and discharge volumes |
| Quarry deepening | What happens to nearby wells and streams as the floor goes down? | Planning application and EIAR chapter |
| Landfill risk | Where would leachate travel if containment failed? | [Licence application](https://verde.ie/services/ippc-waste-licensing) and risk assessment |
| Source protection zoning | Which land feeds this borehole or spring? | Source protection zone map |

## How are drinking-water sources protected?

By mapping the land that feeds them. Source protection zone delineation assesses the area that contributes groundwater to a borehole or spring, and Water Framework Directive assessments test whether a project could harm a water body. GSI and local authorities now have [groundwater protection scheme](https://gsi.ie/programmes-projects/groundwater/groundwater-projects/protecting-drinking-water/what-is-drinking-water-protection/county-groundwater-protection-schemes/) mapping for the whole country.

- Public supply wells have source protection areas, managed by Uisce Éireann and published by GSI.
- Group water schemes serving more than 15 people have mapped zones of contribution.
- Verdé delineates drinking-water source protection zones for other boreholes and springs.
- Verdé prepares Water Framework Directive compliance assessments for projects near a water body.

## What does a monitoring network measure?

Level, flow and quality, continuously. Verdé designs, installs, calibrates and reports telemetered monitoring networks, so groundwater levels, flows and water quality arrive as live data between site visits, ready for licence returns, model checks or planning conditions.

Table: What a telemetered water monitoring network records

| Measurement | What it shows | Typical use |
| --- | --- | --- |
| Water level | How high groundwater stands and how it responds to pumping or rain | Abstraction impact, dewatering, model calibration |
| Flow | How much water moves in a stream, spring or pipe | Abstraction returns, water balance audits |
| Quality | What is in the water, from field readings and laboratory samples | WFD, source protection, licence conditions |

## What water projects has Verdé delivered?

Well fields, lakes and new developments. Verdé has reviewed whether a caravan park's well field could support a further groundwater source, then supervised and tested the new wells, sampled lakes with crews trained in boat handling and sea survival, and combined a hydrogeological site investigation with an appropriate assessment for a proposed cemetery.

- **2023**: [Groundwater Resources Development](https://verde.ie/projects/groundwater-resources-development) Ireland A hydrogeological review of the available information, to judge whether a further groundwater source could be developed at the existing well field.; Step pumping tests on all wells and a 3-day constant rate test on two production wells.
- **2023**: [Lake Water Quality Monitoring](https://verde.ie/projects/lake-water-quality-monitoring) Ireland Samples and field readings from open water and shore locations.; Samplers trained in boat handling and sea survival, using quality-assured methods.
- **2023**: [Hydrogeological and Appropriate Assessment](https://verde.ie/projects/hydrogeological-appropriate-assessment) Ireland A hydrogeological site investigation paired with an appropriate assessment.; Prepared for a proposed cemetery development.

Table: What to compare when choosing a hydrogeologist

| Criterion | Verdé | What it means for you |
| --- | --- | --- |
| Abstraction work | Full dossier: source characterisation, yield testing, impact assessment | One team from the first test to the EPA submission. |
| Modelling | Numerical models for dewatering, quarrying, landfill and source protection | The same modellers work across planning and licensing questions. |
| Fieldwork | Own drilling crews, test pumping and telemetered monitoring | Data for the model comes from Verdé's own wells. |
| Record | Groundwater resource development since October 2012 | Over a decade of Irish groundwater work. |
| Response | Reply within one working day | Abstraction questions get a first answer inside a working day. |

## Questions about hydrogeology and abstraction

Still have a question? Call [01 201 1260](tel:+35312011260) or email [info@verde.ie](mailto:info@verde.ie).

### Do I need to register my water abstraction with the EPA?

Yes, if it reaches 25 m³ (25,000 litres) in any 24 hours, unless it is a listed exemption such as a domestic well, test pumping or firefighting ([EPA](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/)). Registration is free and online through EDEN ([EPA FAQs](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/faqs-on-water-abstraction-and-associated-impoundment-regulation/)). At 2,000 m³ or more in any 24 hours, the abstraction needs an EPA licence rather than registration alone.

### How do I know if I abstract more than 25 m³ a day?

25 m³ is 25,000 litres, measured over your busiest 24 hours. Multiply the pump rate by the hours it runs that day: a pump delivering 1 litre a second for 7 hours moves 25.2 m³. The EPA publishes guidance on estimating abstraction volumes, and Verdé can install a flow meter to measure it properly.

### Is a domestic well exempt from registration?

Yes. Abstraction from a borehole or well that supplies drinking water to a domestic dwelling is a listed exemption under the 2024 Regulations ([S.I. 419 of 2024](https://www.irishstatutebook.ie/pdf/2024/en.si.2024.0419.pdf)), and the EPA notes that a well supplying a single household typically abstracts less than 1 m³ a day. A well that supplies a business or several houses must be registered once it reaches 25 m³ a day.

### Does registering an abstraction mean it is authorised?

No. The EPA says an entry on its abstraction register does not mean the abstraction is authorised. For abstractions between 25 and 1,999 m³ a day, the EPA assesses whether a licence is needed; at 2,000 m³ or more a licence is required automatically. Verdé builds the dossier so it can support either outcome.

### Do the abstraction rules apply to coastal or tidal water?

No. The EPA considers abstractions from transitional water bodies, which are influenced by seawater, and from coastal water bodies to be outside the 2022 Act, so they need no registration or licence ([EPA FAQs](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/faqs-on-water-abstraction-and-associated-impoundment-regulation/)). Fresh surface water and groundwater are in scope, so a well or a river intake further inland counts.

### How do I check groundwater vulnerability at my site in Ireland?

Look up the site on Geological Survey Ireland's groundwater maps, which rate vulnerability from X and E (extreme) through H and M to L (low), based on the type, thickness and permeability of the subsoil over the rock ([GSI](https://data.gov.ie/dataset/groundwater-vulnerability-140000-ireland-roi-itm/resource/1b156eee-82ae-4b3e-acb4-0c88e6c34cf1)). Note the aquifer category beside it and send both with your brief; Verdé confirms them on site where the answer matters.

### What is a source protection zone?

A source protection zone is the land that contributes groundwater to a borehole or spring, mapped so the activities above it can be controlled. GSI publishes source protection areas for public supply wells managed by Uisce Éireann, and zones of contribution for group water schemes serving more than 15 people. Verdé delineates drinking-water source protection zones.

### Can a hydrogeologist in Ireland prepare my abstraction licence application?

Yes. Verdé's hydrogeologists prepare the full technical dossier for surface water and groundwater abstraction under the EPA regime: source characterisation, yield testing and an assessment of the impact on nearby wells, streams and protected sites. The dossier is built to stand up to the EPA's assessment, whether the outcome is registration alone or a licence.

### What does a hydrogeologist need from me to start?

The site location, what you plan to do, any existing borehole records, pumping or abstraction figures, and any monitoring data you hold. GSI's maps and well records can fill some gaps before a site visit. Send what you have and Verdé replies within one working day with the assessment your question needs.

### Can Verdé drill the borehole as well as assess it?

Yes. Verdé's own crews drill exploratory and production boreholes and run test pumping and yield assessments, so the hydrogeologist and the rig work from one brief. The yield data then goes straight into the abstraction dossier, the groundwater model or the source protection assessment, with nothing lost between two firms.

## Sources and further reading

1. [Water abstraction](https://epa.ie/our-services/licensing/freshwater--marine/water-abstraction)Environmental Protection Agency, checked 3 November 2026. When the regime began, and where to register or apply.
2. [Do I need to register or apply for a licence?](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/)Environmental Protection Agency, checked 3 November 2026. The volume tests and the listed exemptions in plain terms.
3. [FAQs on water abstraction and associated impoundment regulation](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/faqs-on-water-abstraction-and-associated-impoundment-regulation/)Environmental Protection Agency, checked 3 November 2026. Free registration, coastal waters and licence deadlines.
4. [S.I. No. 419 of 2024, Water Environment (Abstractions and Associated Impoundments) Regulations 2024](https://www.irishstatutebook.ie/pdf/2024/en.si.2024.0419.pdf)Irish Statute Book, 2024. The Regulations, including the domestic well exemption.
5. [Groundwater data and maps](https://gsi.ie/data-and-maps/groundwater-inside-data-and-maps/)Geological Survey Ireland, checked 3 November 2026. Aquifer categories, vulnerability maps and protection areas.
6. [Groundwater Vulnerability 1:40,000](https://data.gov.ie/dataset/groundwater-vulnerability-140000-ireland-roi-itm/resource/1b156eee-82ae-4b3e-acb4-0c88e6c34cf1)Geological Survey Ireland via data.gov.ie, checked 19 October 2026. The vulnerability categories and how they are worked out.
7. [County Groundwater Protection Schemes](https://gsi.ie/programmes-projects/groundwater/groundwater-projects/protecting-drinking-water/what-is-drinking-water-protection/county-groundwater-protection-schemes/)Geological Survey Ireland, checked 19 October 2026. National protection scheme coverage.

## What happens when you brief Verdé's hydrogeologists

What we ask for

- Site location or Eircode
- Water source: groundwater, river or lake
- Estimated peak daily volume
- What the water is for
- Existing borehole records and monitoring data
- Any EPA request or planning deadline

Reply

Within one working day.

[Brief a hydrogeologist](https://verde.ie/contact?service=water-hydrogeology)

[Call 01 201 1260](tel:+35312011260)

Phone [01 201 1260](tel:+35312011260) or email [info@verde.ie](mailto:info@verde.ie)

## Related services

- [Site investigation drilling](https://verde.ie/services/drilling): Exploratory and production boreholes, with test pumping.
- [Construction dewatering](https://verde.ie/services/construction-dewatering): Drawdown models turned into a working pump system.
- [Which EPA licence does your site need?](https://verde.ie/services/ippc-waste-licensing): Abstraction alongside IE, IPC and waste licensing.
- [Contaminated land](https://verde.ie/services/contaminated-land): When groundwater has been affected by pollution.

Sectors we work in

- [Data centres](https://verde.ie/sectors/data-centres)
- [Quarries and aggregates](https://verde.ie/sectors/quarries-and-aggregates)
- [Food and drink](https://verde.ie/sectors/food-drink)
- [Construction](https://verde.ie/sectors/construction)
- Public water utilities