# Is it waste? Classifying and moving soil and C&D waste in Ireland

Sampling, WAC testing, by-product files and permits, so material leaves site on the right paperwork.

Last updated 3 November 2026

Verdé decides what excavated soil, stone and construction and demolition material is before it moves: a by-product, a non-hazardous waste or a hazardous waste. It samples and tests the material, classifies it under the List of Waste, prepares the by-product registration or notification, permit or export file, and keeps the audit trail for every load.

Waste management here means classifying, documenting and routing industrial, construction and remediation waste in Ireland. Verdé arranges and audits the disposal or recovery route; licensing a waste facility sits on [EPA licensing](https://verde.ie/services/ippc-waste-licensing), cleaning up contaminated ground sits on [contaminated land](https://verde.ie/services/contaminated-land), and both belong to our wider [environmental consultancy](https://verde.ie/services/environmental-consultancy) work.

## Key takeaways

- Excavated soil leaving site is waste unless it passes the by-product test or meets national criteria.
- Greenfield soil and stone that meets the EPA's national criteria is registered, not notified.
- The List of Waste classification decides whether material is hazardous and where it can go.
- Exporting waste needs a notification through the National TFS Office at Dublin City Council.
- Verdé samples, tests, classifies and documents material before it leaves site.

## Is this right for you?

### This is a fit if

- Soil, stone or construction and demolition waste is leaving your site and needs classification and paperwork.
- You want soil or stone treated as a by-product, through a registration or a notification.
- You need a council waste permit or registration, or an EPA waste licence applied for or revised.
- You are exporting waste and need TFS notifications and consignment documents.

### This is not a fit if

- You need a skip for household or small-business waste: use a permitted waste collector.
- You need contaminated ground cleaned up, not just classified: go to [contaminated land](https://verde.ie/services/contaminated-land).
- A fuel or oil leak is happening: phone [0818 714 002](tel:0818714002) at any hour.

If it is not a fit, the links above are the right doors.

## Is your material a waste or a by-product?

Run four tests. Excavated material is a by-product only if its further use is certain, it can be used directly without processing beyond normal industrial practice, it is produced as an integral part of a production process, and its further use is lawful. Greenfield soil and stone that meets the [EPA's national criteria](https://www.epa.ie/our-services/licensing/waste/by-products-regulation-27/) is simply registered.

**How the decision tree decides**

Table: Questions, answers and results in the decision tree

| Question | Answer | Result |
| --- | --- | --- |
| What is the material? | Soil and stone from a greenfield site | Register through the EDEN By-product Module if it meets the national criteria ([EPA](https://www.epa.ie/our-services/licensing/waste/by-products-regulation-27/)) |
| What is the material? | Asphalt road planings | National by-product criteria also exist for site-won asphalt |
| What is the material? | Brownfield soil, unsure origin, or other material | Answer the four tests |
| Four tests: certain use, direct use, integral to production, lawful use | Yes to all four | Likely a by-product: a single-case notification goes to the EPA ([Limerick City and County Council](https://www.limerick.ie/council/services/environment-and-climate-action/circular-economy/by-product-regulation-27-soil-and)) |
| Four tests | No to any one | It is waste: classify it under the List of Waste ([EPA, 2019](https://www.epa.ie/publications/monitoring--assessment/waste/waste-classification.php)) |

How this works: the four conditions in Regulation 27 of the European Union (Waste Directive) Regulations 2011 and the EPA national by-product criteria. The EPA decides by-product status on notification.

## How is waste classified as hazardous or not?

With the List of Waste and laboratory tests. Every waste gets a six-digit List of Waste code. Some codes are always hazardous, some never are, and mirror entries depend on whether the material shows a hazardous property. Sampling and testing settle it, and the [EPA's 2019 guidance](https://www.epa.ie/publications/monitoring--assessment/waste/waste-classification.php) sets out the method.

### What does WAC testing show?

Waste acceptance criteria tests measure what a material contains and what leaches from it, so a receiving facility can check it may accept the load. Soil recovery facilities apply the criteria in the [EPA's 2020 guidance](https://www.epa.ie/publications/compliance--enforcement/waste/Guidance-on-Waste-Acceptance-Criteria-at-Authorised-Soil-Recovery-Facilities.pdf).

### What a Verdé classification covers

- Sampling from trial pits, boreholes or stockpiles, with [drilling](https://verde.ie/services/drilling) where depth is needed.
- Laboratory testing, including WAC testing where the receiving facility asks for it.
- A List of Waste code for each material, with mirror entries assessed rather than assumed.
- A classification report the receiving facility can read against its own acceptance criteria.

## Where can excavated soil go?

Five routes, from reuse to disposal: reuse on the same site, use on another site as a by-product, an authorised soil recovery facility, landfill, or export under a TFS notification. Each route has its own paperwork or acceptance test, so the classification comes first and the route follows from it.

**Figure: Where excavated soil can legally go.** Excavated soil routes: reuse on site, by-product, soil recovery, landfill or export, each behind its own gate document.

Every route off site has a gate: a registration, a notification, acceptance tests or a TFS notice. Classification comes first because it decides which gates open. Sources: EPA by-product and WAC guidance; Dublin City Council National TFS Office.

Table: Data behind this graphic

| Route | Gate | Decided by |
| --- | --- | --- |
| Reuse on the same site | Clean soil used in its natural state where it was dug | The project team, on the evidence |
| By-product to another site | Registration (greenfield criteria) or single-case notification | EPA |
| Soil recovery facility | Waste acceptance criteria | The facility, under its authorisation |
| Landfill | Waste acceptance criteria | The landfill, under its licence |
| Export | TFS notification and movement documents | National TFS Office |

### What changes the route

- **If greenfield soil and stone meets the EPA's national by-product criteria**: then it is registered through EDEN and no notification is needed.
- **If the soil is from a brownfield site**: then a single-case by-product notification goes to the EPA, which makes the determination.
- **If any of the four by-product tests fails**: then the material is waste and must be classified before it moves.
- **If a mirror-entry waste shows a hazardous property**: then it is hazardous waste, and moving it within Ireland uses a Waste Transfer Form through the National TFS Office ([Roscommon County Council](https://www.roscommoncoco.ie/en/services/environment/waste-regulation/hazardous-waste/)).
- **If the material is going to a soil recovery facility**: then it must meet that facility's waste acceptance criteria.
- **If waste will leave Ireland under prior written notification**: then it is notified through the National TFS Office at [Dublin City Council](https://www.dublincity.ie/residential/environment/national-tfs-office/about-national-tfs-office).
- **If it is a construction or demolition project**: then the resource and waste management plan follows the EPA's 2021 guidelines.

## Which documents does each route need?

One document per decision. A classification report backs every movement, a by-product registration or notification covers soil going to another site, facilities hold permits, registrations or licences, construction projects keep a resource and waste management plan, and exports need a TFS notification. Verdé prepares each one and keeps the audit trail.

Table: Waste documents, when you need them and who receives them

| Document | When you need it | Who receives or issues it |
| --- | --- | --- |
| Waste classification report | Before any waste leaves site | Prepared by Verdé; read by the receiving facility |
| WAC test results | Before a soil recovery facility or landfill accepts the load | The facility's acceptance check |
| By-product registration (greenfield) | Before soil or stone moves, where national criteria are met | EPA, through EDEN's By-product Module |
| By-product notification (single case) | Before material moves as a by-product in other cases | EPA, which makes a determination |
| Resource and waste management plan | At planning and through construction | Planning authority and the contractor |
| Waste facility permit or certificate of registration | To operate a facility under those regimes | Usually the local authority ([EPA](https://www.epa.ie/our-services/licensing/waste/waste-licensing/who-needs-a-waste-licence/)) |
| Waste licence | To run a licensed waste activity | [EPA](https://verde.ie/services/ippc-waste-licensing) |
| TFS notification and movement documents | Before waste is exported or imported | National TFS Office, Dublin City Council |
| Waste Transfer Form | When hazardous waste moves within Ireland | National TFS Office, Dublin City Council |

## What goes into a construction resource and waste management plan?

A plan for every material the project will create, from design through to deconstruction. The [EPA's 2021 best practice guidelines](https://www.epa.ie/publications/circular-economy/resources/best-practice-guidelines-for-the-preparation-of-resource--waste-management-plans-for-construction--demolition-projects.php) set two tiers: a template plan for smaller Tier 1 projects and minimum contents for larger Tier 2 projects. The guidelines note that construction and demolition waste is the largest waste stream in the EU.

Verdé prepares materials management plans and waste management plans to accompany planning applications, and advises contractors on the obligations that apply on site, so the plan written for planning is the one the site actually works to.

## What waste work has Verdé done?

Classification in the ground and plans on paper. Verdé dug fourteen trial pits, generally 2.0 to 3.0 metres deep, to classify soil for Collen Construction, and advised contractors on their environmental obligations in a construction and demolition waste management plan.

- **2023**: [Soil Waste Classification – Collen Construction](https://verde.ie/projects/soil-waste-classification) for Collen Construction A waste classification of the soils to be excavated, to set their off-site disposal or recovery options.; Representative samples from fourteen trial pits at key positions, generally 2.0 to 3.0 m deep.
- **2023**: [Construction and Demolition Waste Management Plan](https://verde.ie/projects/environmental-services-soil) Ireland Waste management procedures for everyone working on the site, from the main contractor down.; Environmental obligations set out for the construction and demolition phases.
- **2018**: [Soil Recovery Waste Acceptance Criteria – EPA Draft Guidance Note](https://verde.ie/news/soil-recovery-waste-acceptance-criteria) In December 2017 the EPA issued a draft guidance note on waste acceptance criteria for soil recovery facilities.; Licensed soil recovery facilities may accept only uncontaminated natural soil and stone.

Table: What to compare when choosing a waste consultant

| Criterion | Verdé | What it means for you |
| --- | --- | --- |
| Classification | Sampling and WAC testing under the List of Waste | The receiving facility gets the evidence it asks for. |
| By-product work | Materials management plans and Regulation 27 notifications | Clean material has a route other than landfill. |
| Permits and licences | Waste facility permits, certificates of registration, waste licences | One adviser for council and EPA authorisations. |
| Exports | TFS notifications, consignment documents, audited routes | Cross-border loads carry their paperwork. |
| Fieldwork | Own trial pits and drilling for sampling | Samples come from the team that writes the report. |
| Response | Reply within one working day | Your material's likely route is known inside a working day. |

## Questions about waste and by-products

Still have a question? Call [01 201 1260](tel:+35312011260) or email [info@verde.ie](mailto:info@verde.ie).

### How do I classify soil waste as hazardous or non-hazardous in Ireland?

Give the soil a List of Waste code, then sample and test it. Excavated soil usually falls under a mirror entry, so the laboratory results decide whether it shows a hazardous property and takes the hazardous code. The EPA's 2019 guidance sets out the method ([EPA, 2019](https://www.epa.ie/publications/monitoring--assessment/waste/waste-classification.php)), and Verdé reports the code, the evidence and the routes the soil can take.

### What is a mirror entry in the List of Waste?

A mirror entry is a pair of List of Waste codes for the same kind of waste, one hazardous and one not. Which code applies depends on whether the material shows a hazardous property, so it has to be sampled and assessed rather than assumed. The EPA's 2019 classification guidance explains how to make that call, and Verdé reports it in the classification.

### What is WAC testing for soil?

Waste acceptance criteria testing measures what a material contains and what leaches out of it, so a receiving facility can confirm it may accept the load. Soil recovery facilities apply the criteria in the EPA's 2020 guidance. Verdé samples the material, arranges the laboratory tests and reports the results against the facility's criteria.

### Does greenfield soil need a by-product notification?

Not if it meets the EPA's national by-product criteria for greenfield soil and stone. Material that meets them is registered through the By-product Module on the EPA's EDEN portal instead of being notified for a decision. Verdé checks the soil against the criteria and prepares the registration and the by-product file that goes with it.

### How does an Article 27 by-product notification for brownfield soil work?

Brownfield soil and stone goes through a single-case notification under Regulation 27, still often called Article 27, and the EPA makes the determination. In 2026 the EPA consulted on new guidance for brownfield soil and stone, including a screen for PFAS, with submissions closing at 5pm on 22 May 2026 ([EPA, 2026](https://www.epa.ie/publications/corporate/consultations/-consultations/position-paper-regulation-27-consultation-to-inform-development-of-draft-guidance-for-brownfield-soil-and-stone-by-product-material-incorporating-a-pfas-screen.php)). Verdé builds each notification to the EPA's current position.

### Who do I notify to export hazardous waste from Ireland?

The National TFS Office at Dublin City Council. Dublin City Council is the national competent authority for exports, imports and transits of waste, and shipments that need prior written notification go to and through that office, which also handles hazardous waste moving within Ireland. Verdé prepares TFS notifications and consignment documents and audits the receiving route.

### Can contaminated soil go to a soil recovery facility?

Only if it meets that facility's authorisation and its waste acceptance criteria. The EPA's 2020 guidance sets acceptance criteria for authorised soil recovery facilities, so the classification and WAC results decide whether the load is accepted or must go elsewhere. Verdé matches each load to a route it can legally take.

## Sources and further reading

1. [By-products (Regulation 27)](https://www.epa.ie/our-services/licensing/waste/by-products-regulation-27/)Environmental Protection Agency, checked 19 October 2026. The four tests and the national criteria.
2. [Position paper: Regulation 27 consultation on brownfield soil and stone by-product guidance, with a PFAS screen](https://www.epa.ie/publications/corporate/consultations/-consultations/position-paper-regulation-27-consultation-to-inform-development-of-draft-guidance-for-brownfield-soil-and-stone-by-product-material-incorporating-a-pfas-screen.php)Environmental Protection Agency, 2026. Where brownfield guidance is heading, including PFAS.
3. [Waste Classification: List of Waste and determining if waste is hazardous or non-hazardous](https://www.epa.ie/publications/monitoring--assessment/waste/waste-classification.php)Environmental Protection Agency, 2019. How to decide hazardous or not.
4. [Guidance on waste acceptance criteria at authorised soil recovery facilities](https://www.epa.ie/publications/compliance--enforcement/waste/Guidance-on-Waste-Acceptance-Criteria-at-Authorised-Soil-Recovery-Facilities.pdf)Environmental Protection Agency, 2020. What a soil recovery facility can accept.
5. [Best practice guidelines for the preparation of resource and waste management plans for construction and demolition projects](https://www.epa.ie/publications/circular-economy/resources/best-practice-guidelines-for-the-preparation-of-resource--waste-management-plans-for-construction--demolition-projects.php)Environmental Protection Agency, 2021. The two-tier plan approach.
6. [About the National TFS Office](https://www.dublincity.ie/residential/environment/national-tfs-office/about-national-tfs-office)Dublin City Council, checked 19 October 2026. Who handles waste shipments.
7. [By-product (Regulation 27) soil and stone](https://www.limerick.ie/council/services/environment-and-climate-action/circular-economy/by-product-regulation-27-soil-and)Limerick City and County Council, checked 19 October 2026. Greenfield registration versus brownfield notification.
8. [Hazardous waste](https://www.roscommoncoco.ie/en/services/environment/waste-regulation/hazardous-waste/)Roscommon County Council, checked 19 October 2026. The Waste Transfer Form.
9. [Who needs a waste licence](https://www.epa.ie/our-services/licensing/waste/waste-licensing/who-needs-a-waste-licence/)Environmental Protection Agency, checked 19 October 2026. The four waste authorisation outcomes.

## What happens when you send a waste enquiry

What we ask for

- What the material is
- Where it came from, including the site's history
- Estimated quantity, in tonnes or cubic metres
- The proposed destination
- Any sampling results
- Existing permits
- Your programme

Reply

Within one working day.

[Get your material classified](https://verde.ie/contact?service=waste-management)

[Call 01 201 1260](tel:+35312011260)

Phone [01 201 1260](tel:+35312011260) or email [info@verde.ie](mailto:info@verde.ie)

## Related services

- [Contaminated land](https://verde.ie/services/contaminated-land): Remediation when the ground itself needs fixing.
- [Which EPA licence does your site need?](https://verde.ie/services/ippc-waste-licensing): Waste licences, permits and registrations.
- [Site investigation drilling](https://verde.ie/services/drilling): Trial pits and boreholes for sampling.
- [Construction dewatering](https://verde.ie/services/construction-dewatering): When pumped or tankered water needs a route too.

Sectors we work in

- [Construction](https://verde.ie/sectors/construction)
- [Quarries and aggregates](https://verde.ie/sectors/quarries-and-aggregates)
- [Public sector](https://verde.ie/sectors/public-sector)
- [Petrochemical](https://verde.ie/sectors/petrochemical)
- [Manufacturing](https://verde.ie/sectors/commercial-and-industrial)