Source: https://verde.ie/services/ev-infrastructure

Renewables

# Environmental and planning support for EV charging infrastructure in Ireland

Verdé supports EV charging infrastructure projects in Ireland through site selection and feasibility, planning-application packs, relevant contaminated-land investigations and construction environmental management. The listed scope covers public, fleet and destination charging, from individual sites to rollout programmes. Discuss project support and electrical installation arrangements separately when defining your enquiry.

Scope of works

EV infrastructure delivered without the planning drag .

Delivered by Verdé’s in-house environmental scientists, engineers and licensing specialists.

- 01Site selection & feasibility
- 02Planning-application packs
- 03Contaminated-land clearance
- 04Construction environmental management

For homeowners

## Want a charger at home?

We will confirm what your supply can support, where the charge point should go, and what the installation involves — no jargon required.

1. 1. Check your supply We confirm your existing electrical capacity is suitable for a home charge point.
2. 2. Pick the right spot Cable routes, parking and future use are considered so the charger works day to day.
3. 3. Install and hand over Installed, tested and explained, so you can use it with confidence from day one.

[Ask about a home EV charger](https://verde.ie/contact)

[Talk to someone — 0818 714 002](tel:0818714002)

## Overview

Describe your site, the work proposed and any existing reports or approvals. Verdé can then assess the appropriate scope; requirements and outcomes depend on the site.

### Site selection & feasibility

Constraints mapping across ecology, contaminated land, flood risk and grid capacity — before the option is signed.

### Planning-application packs

Screening for EIA, AA screening, drainage design and landscape rationale — one coordinated submission.

### Contaminated-land clearance

Phase 1 & 2 investigations on forecourt and brownfield conversions, with remediation strategy if triggered.

### Construction environmental management

CEMPs, noise and dust monitoring, and Local Authority liaison through commissioning.

What you get

- Site-selection constraints report
- Planning environmental pack
- Contaminated-land assessment
- Construction Environmental Management Plan
- Operational compliance monitoring

[Start a conversation](https://verde.ie/contact)

Sectors served

- [Renewables](https://verde.ie/sectors/renewables)
- [Public sector](https://verde.ie/sectors/public-sector)
- Fleet & logistics
- Retail & forecourt

## Questions about EV infrastructure delivered without the planning drag .

### What support is available before EV charging installation?

Verdé lists site constraints mapping, feasibility, planning and environmental information, contaminated-land investigations where relevant, and construction environmental management. The work required depends on the proposed charging site and existing conditions.

### What should I send with an EV infrastructure enquiry?

Send the site address, intended use, available layout drawings and any planning or electrical-supply information. State whether the enquiry concerns a public, fleet, destination or home charger so the scope and installation responsibilities can be discussed.

## Related environmental services

- [renewable energy](https://verde.ie/services/renewable-energy)
- [contaminated land](https://verde.ie/services/contaminated-land)
- [environmental consultancy](https://verde.ie/services/environmental-consultancy)

## Sources and further reading

- [SEAI: electric vehicles and charging information](https://www.seai.ie/plan-your-energy-journey/for-your-home/electric-vehicles)

Service information checked against Verdé’s published service descriptions on 19 October 2026. Site-specific scope and requirements are agreed after assessment.
