# Environmental impact assessment in Ireland: when you need an EIAR, and what goes in it

Verdé screens projects for EIA, scopes the report and writes the EIAR chapters in its own disciplines, from water and soils to air, noise and biodiversity, working with specialist partners on the rest.

Last updated 24 November 2026

From 26 November 2026, an EIAR is mandatory above

- 750 homes
- 5 ha quarry
- 5 wind turbines
- 15 ha industrial estate

Below a threshold the project is screened; below a lower band it is examined for its nature and location only.

[The 2026 screening regulations, Department of Housing](https://assets.gov.ie/static/documents/f7d72ca2/Planning_and_Development_Part_6_Screening_Classes_Thresholds_Criteria_and_Examination_Regulations_2026.pdf)

Environmental impact assessment, or EIA, is the process a planning authority or other competent authority uses to examine a project's likely significant effects on the environment before deciding whether it can go ahead. The developer's part is the environmental impact assessment report, or EIAR, which replaced the environmental impact statement in Irish planning law on 1 September 2018. For applications lodged from 26 November 2026, an EIAR is mandatory above the thresholds in the new 2026 screening regulations, such as more than 750 homes or a quarry over 5 hectares; smaller projects are screened, and the smallest are examined for their nature and location. Verdé screens projects, scopes the EIAR and writes its chapters on water, land and soils, air, noise and biodiversity.

Environmental impact assessment here means the EIA process for planning and other development consent in Ireland, and the EIAR that supports it. Appropriate Assessment of effects on Natura 2000 sites is a separate test with its own report, the Natura Impact Statement: see [Appropriate Assessment](https://verde.ie/services/appropriate-assessments). Checking a site before buying it is [environmental due diligence](https://verde.ie/services/environmental-due-diligence).

## Key takeaways

- EIA is the competent authority’s process; the EIAR is the report the developer prepares for it.
- The EIAR replaced the environmental impact statement (EIS) in Irish planning law on 1 September 2018.
- For applications lodged from 26 November 2026, an EIAR is mandatory above the new thresholds, such as more than 750 homes, a quarry over 5 hectares or more than 5 wind turbines.
- Below that, a project is screened, and the smallest are examined only for nature and location; either can still lead to an EIAR if significant effects are likely.
- The developer must register the project on the Department of Housing's EIA Portal before applying.

## Is this right for you?

### This is a fit if

- Your project may pass a mandatory threshold and you need to know whether an EIAR is needed.
- Your project is below a threshold but close to homes, water or a protected site, and needs EIA screening.
- Your EIAR needs chapters on water, land and soils, air quality, noise or biodiversity.
- A planning authority or An Coimisiún Pleanála has asked for further information on environmental effects.

### This is not a fit if

- Only Appropriate Assessment screening or a Natura Impact Statement is needed: go to [Appropriate Assessment](https://verde.ie/services/appropriate-assessments).
- You need an EPA licence rather than planning consent: go to [EPA and IPC licensing](https://verde.ie/services/ippc-waste-licensing).
- You want a legal opinion on planning law: ask a planning solicitor; Verdé supplies the environmental evidence.

If it is not a fit, the links above go to the right team, and Verdé will say who can help with the rest.

## What is an EIAR, and how is it different from an EIA?

The EIA is the process; the EIAR is the developer's report within it. The competent authority, such as the planning authority or An Coimisiún Pleanála, carries out the EIA and reaches a reasoned conclusion on the project's significant effects. The EIAR, prepared by competent experts for the developer, gives it the evidence.

EIA, the EIAR and the reports around them

| Term | What it is | Who prepares it or carries it out |
| --- | --- | --- |
| EIA | The whole assessment process, ending in a reasoned conclusion and the decision | The competent authority, such as the planning authority or An Coimisiún Pleanála |
| EIAR | The report of the project's likely significant effects and how they will be avoided or reduced | The developer, through competent experts |
| EIS | The old name for the report | Replaced by the EIAR on 1 September 2018 |
| EIA screening report | A shorter report on whether a project below a threshold needs a full EIAR | The developer, for the competent authority to decide |
| Natura Impact Statement | The report for an Appropriate Assessment of effects on Natura 2000 sites | The developer; a separate test from EIA |

The [2018 Regulations](https://www.irishstatutebook.ie/2018/en/si/0296.html), in force from 1 September 2018, brought the 2014 EU directive into Irish planning law, replaced the environmental impact statement with the EIAR and set up the EIA Portal. The EPA describes EIA as running from the design stage through consultation, the EIAR and its evaluation, to the decision on whether the project can proceed ([EPA](https://www.epa.ie/our-services/monitoring--assessment/assessment/environmental-impact-assessment/)).

![A Verdé consultant in a hard hat looking up at two large storage tanks on an industrial site.](https://verde.ie/api/public/media/library/2024/02/verde-environmental-planning.jpg)

## What are the stages of environmental impact assessment?

Seven, from screening to decision. Screening decides whether an EIAR is needed and scoping sets what it covers; the developer registers on the EIA Portal and prepares the EIAR; the public and statutory bodies are consulted; the competent authority examines it, reaches a reasoned conclusion and builds that into its decision.

### The seven stages, and who does each

1. Screening (developer and authority): Is an EIAR mandatory, or likely to be needed? Thresholds first, then case-by-case screening below them.
2. Scoping (developer and authority): What the EIAR must cover and in how much detail; the developer can ask the competent authority for a scoping opinion.
3. EIA Portal (developer): Before applying, the developer sends the project's details to the Department of Housing's EIA Portal.
4. EIAR (developer): Baseline surveys, reasonable alternatives, likely effects, mitigation and monitoring, by competent experts, with a non-technical summary.
5. Consultation (public and statutory bodies): The public and bodies such as the EPA comment on the application and the EIAR.
6. Examination and reasoned conclusion (competent authority): The authority examines the EIAR and submissions, asks for further information if needed, and concludes on the significant effects.
7. Decision (competent authority): The reasoned conclusion is built into the decision to grant or refuse, with conditions such as monitoring.

The 2014 directive defines EIA as the developer's EIAR, consultation, the competent authority's examination, its reasoned conclusion on significant effects, and the integration of that conclusion into the decision ([Directive 2014/52/EU](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32014L0052)). Since 18 June 2025 the national planning body has been An Coimisiún Pleanála, which replaced An Bord Pleanála ([gov.ie, 2025](https://www.gov.ie/en/department-of-housing-local-government-and-heritage/press-releases/an-coimisi%C3%BAn-plean%C3%A1la-irelands-national-independent-planning-body-launched/)).

## Which projects need an EIAR in Ireland?

For applications lodged from 26 November 2026, projects above the new thresholds always do: for example more than 750 homes, urban development over 5 hectares in a business district or 15 elsewhere, or a quarry over 5 hectares. Below them a project is screened, and below a lower band it is examined for its nature and location only.

A selection of the thresholds in Schedule 2 of the 2026 screening regulations; the full list covers many more project types. Above a threshold an EIAR is mandatory; below it the project is screened, or examined if it is below the lower band.   Source:  [Department of Housing, 2026 screening regulations](https://assets.gov.ie/static/documents/f7d72ca2/Planning_and_Development_Part_6_Screening_Classes_Thresholds_Criteria_and_Examination_Regulations_2026.pdf).

Data behind this graphic

| Project | EIAR mandatory, lodged from 26 November 2026 | Lodged up to 25 November 2026 |
| --- | --- | --- |
| Housing | More than 750 homes | More than 500 homes |
| Urban development | Over 5 hectares in a business district, 15 elsewhere | Over 2 hectares in a business district, 10 in other built-up areas, 20 elsewhere |
| Industrial estate | Over 15 hectares | Over 15 hectares |
| Quarry or pit | Area of extraction over 5 hectares | Area of extraction over 5 hectares |
| Wind farm | More than 5 turbines | More than 5 turbines, or a total output over 5 MW |
| Waste disposal | More than 25,000 tonnes a year | More than 25,000 tonnes a year |
| Groundwater abstraction | More than 2 million m³ in an average year | More than 2 million m³ a year |
| Overhead power line | 200 kV or more | 200 kV or more |
| Electricity, steam or hot water installation | Heat output of 300 MW or more | Heat output of 300 MW or more |

Thresholds for applications lodged from 26 November 2026

| What you enter | EIAR mandatory | Examination only |
| --- | --- | --- |
| Number of homes | more than 750 homes | less than 250 homes |
| Urban development in a business district: site area | more than 5 hectares | less than 1.5 hectares |
| Urban development elsewhere: site area | more than 15 hectares | less than 5 hectares |
| Car park: number of spaces | more than 1,000 spaces | less than 300 spaces |
| Shopping centre: gross floor space | more than 50,000 m² | less than 10,000 m² |
| Industrial estate development: site area | more than 15 hectares | less than 5 hectares |
| Area of extraction | more than 5 hectares | less than 2 hectares |
| Number of turbines | more than 5 turbines | less than 2 turbines |
| Waste taken in each year | more than 25,000 tonnes | less than 10,000 tonnes |
| Groundwater abstracted or recharged in an average year | more than 2 million m³ | No lower band |
| Overhead power line voltage | at least 200 kV | at most 110 kV |
| Heat output of the installation | at least 300 MW | at most 100 MW |

How this works: Schedule 2 of the [2026 screening regulations](https://assets.gov.ie/static/documents/f7d72ca2/Planning_and_Development_Part_6_Screening_Classes_Thresholds_Criteria_and_Examination_Regulations_2026.pdf) for applications lodged from 26 November 2026, and Schedule 5, Part 2 of the 2001 Regulations ([Department of Housing](https://consult.housing.gov.ie/en/system/files/materials/8/Current%20Environmental%20Impact%20Assessment%20Screening%20Thresholds.pdf)) for those lodged up to 25 November. The competent authority makes the final determination.

The EPA notes that projects which do not meet a threshold may still require EIA if they are likely to have significant effects on the environment ([EPA](https://www.epa.ie/our-services/monitoring--assessment/assessment/environmental-impact-assessment/)). Location matters most: a smaller project close to a Special Area of Conservation, a river or homes is the one most likely to be screened in.

The new thresholds are in the Planning and Development (Part 6) (Screening Classes, Thresholds, Criteria and Examination) Regulations 2026, one of the sets of regulations that start with the rest of the Planning and Development Act 2024 on 26 November 2026 ([Department of Housing](https://www.gov.ie/en/department-of-housing-local-government-and-heritage/publications/confirmation-of-the-commencement-date-for-the-2024-act/)). They raise the housing threshold from 500 to 750 homes and add the lower, examination-only band. Applications lodged before midnight on 25 November are decided under the old Schedule 5 thresholds.

Thresholds for applications lodged up to 25 November 2026

| What you enter | Threshold | What it triggers |
| --- | --- | --- |
| Number of homes | more than 500 homes | mandatory EIAR |
| Urban development in a business district: site area | more than 2 hectares | mandatory EIAR |
| Urban development in another built-up area: site area | more than 10 hectares | mandatory EIAR |
| Urban development elsewhere: site area | more than 20 hectares | mandatory EIAR |
| Industrial estate development: site area | more than 15 hectares | mandatory EIAR |
| Area of extraction | more than 5 hectares | mandatory EIAR |
| Number of turbines | more than 5 turbines | mandatory EIAR |
| Total output of the wind farm | more than 5 MW | mandatory EIAR |
| Waste taken in each year | more than 25,000 tonnes | mandatory EIAR |
| Groundwater abstracted or recharged each year | more than 2 million m³ | mandatory EIAR |
| Overhead power line voltage | at least 200 kV | mandatory EIAR |
| Heat output of the installation | at least 300 MW | mandatory EIAR |

## What must an EIAR cover?

Five groups of factors set by the EU directive: population and human health; biodiversity; land, soil, water, air and climate; material assets, cultural heritage and landscape; and how they interact. It must also cover the project's vulnerability to major accidents and disasters, reasonable alternatives, the baseline and a non-technical summary.

The EIAR's factors and Verdé's part in each

| Factor | What the chapter looks at | Verdé's part |
| --- | --- | --- |
| Population and human health | Homes and amenity, and the health effects of emissions and noise | Air quality, noise and vibration evidence |
| Biodiversity | Habitats and species, especially those protected under the Habitats and Birds Directives | Ecology surveys and [Appropriate Assessment](https://verde.ie/services/appropriate-assessments) screening |
| Land, soil, water, air and climate | Geology, contamination, surface water, groundwater, air quality and climate | [Land and soils](https://verde.ie/services/contaminated-land), [hydrology and hydrogeology](https://verde.ie/services/water-hydrogeology), [air quality](https://verde.ie/services/air-noise-acoustics) and climate chapters |
| Material assets, cultural heritage and landscape | Utilities, waste, traffic, archaeology, architecture and views | [Waste](https://verde.ie/services/waste-management) under material assets; specialist partners for heritage, landscape and traffic |
| Interaction between the factors | How the effects combine | Coordinated across the chapters |
| Major accidents and disasters | The project's vulnerability to relevant risks, such as flooding | Assessed with the project team |

### Written by competent experts

The directive requires the developer to have the EIAR prepared by competent experts, and lets the competent authority ask for supplementary information it needs for its reasoned conclusion ([Directive 2014/52/EU](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32014L0052)). The EPA's [2022 guidelines](https://www.epa.ie/publications/monitoring--assessment/assessment/guidelines-on-the-information-to-be-contained-in-environmental-impact-assessment-reports-eiar.php) set out the information each chapter should contain, and apply to EIARs for any consent, not only EPA licences.

![Illustration of five report binders marked for water, biodiversity, air, soils and noise, beside layered site maps and a magnifier.](/images/services/eiar-chapters-illustration.webp)

An EIAR is a set of topic chapters read together, each built on its own baseline survey.

## What if the authority asks for further information?

Answer it with evidence. Under the EIA directive the competent authority can ask the developer for the supplementary information it needs to reach its reasoned conclusion. Verdé answers requests on its own chapters with new surveys or analysis where needed, and its published services include presenting evidence at public inquiries.

### How Verdé handles a further information request on its chapters

1. Read the request against the EIAR and the submissions that prompted it
2. Agree with the project team what new survey, sampling or modelling each point needs
3. Carry out the fieldwork with its own crews, with laboratory analysis where it is needed
4. Revise the chapter and its non-technical summary, and write a point-by-point response
5. Present the evidence at an oral hearing if one is held

![A Verdé engineer beside a drilling rig installing a groundwater monitoring well in a field.](https://verde.ie/__l5e/assets-v1/bac3ed72-507d-42c6-a1ac-8f78d96d3872/hydrogeological-appropriate-assessment.jpg)

Installing a monitoring well for the hydrogeological assessment of a proposed cemetery site.

## What EIA work has Verdé delivered?

Ground, groundwater and ecology evidence for planning. Verdé investigated a greenfield site for a proposed cemetery, with trial pits, monitoring wells, groundwater flow and Appropriate Assessment screening, and published its soil, geology and hydrogeology chapter work for an anaerobic digester in a former basalt quarry in Co. Antrim.

- [Hydrogeological and Appropriate Assessment for a cemetery](https://verde.ie/projects/hydrogeological-appropriate-assessment). 2023, Ireland. Trial pits, subsoil samples and groundwater monitoring wells on a greenfield site; Groundwater flow direction and travel times from static water levels; Ecological screening for Appropriate Assessment under Article 6 of the Habitats Directive
- [Soil, geology and hydrogeology chapter work](https://verde.ie/projects/soil-geology-hydrogeology). 2023, Co. Antrim. Bedrock monitoring wells and a production well for an anaerobic digester in a former basalt quarry; Step tests and a 3-day constant rate pumping test to set a sustainable yield; The hydrogeological report for an industrial abstraction licence
- [Verdé guide to environmental impact assessment](https://verde.ie/news/environmental-impact-assessment). 2018, Ireland. What EIA and the EIAR are, and how the process runs from design to decision

## EIA terms in plain English

Eight terms come up in every EIA. Knowing them makes a screening determination, a scoping opinion or a request for further information quicker to read, and makes it clearer what the planning authority is asking for.

EIA

The competent authority's process of examining a project's likely significant effects on the environment.

EIAR

The environmental impact assessment report: the developer's report of those effects.

EIS

The environmental impact statement, the name for the report before 1 September 2018.

Screening

Deciding whether a project below a threshold needs an EIAR.

Scoping

Deciding what an EIAR must cover and in how much detail.

Reasoned conclusion

The competent authority's conclusion on the project's significant effects, which the decision must reflect.

Non-technical summary

A short, plain-language summary of the EIAR that anyone can read.

EIA Portal

The Department of Housing's public website listing applications that need EIA.

## Questions about environmental impact assessment

Still have a question? Call  [01 201 1260](tel:+35312011260)  or email  [info@verde.ie](mailto:info@verde.ie).

### What does EIAR stand for?

Environmental impact assessment report. It is the report a developer submits with an application for development consent, setting out the project's likely significant effects on the environment and how they will be avoided, reduced or offset. In Irish planning law it replaced the environmental impact statement, or EIS, on 1 September 2018, under the 2018 EIA Regulations.

### Can a project below the threshold still need an EIA?

Yes. A project below a mandatory threshold is screened, or for the smallest projects examined for its nature and location, and still needs an EIAR if it is likely to have significant effects on the environment because of its nature, size or location, such as close to a protected site, a river or homes. The EPA notes that projects below a threshold may still require EIA.

### Who prepares an EIAR?

The developer, through competent experts. The EU directive requires the report to be prepared by competent experts, and in practice a lead consultant coordinates specialist chapters on topics such as water, soils, air, noise, biodiversity, landscape and heritage. Verdé writes the chapters in its own disciplines and works with specialist partners on the rest.

### What is the difference between EIA and Appropriate Assessment?

EIA looks at all the likely significant environmental effects of a project. Appropriate Assessment looks only at effects on Natura 2000 sites, Special Areas of Conservation and Special Protection Areas, under the Habitats Directive. Many projects need both: an EIAR for the application and an Appropriate Assessment screening report or Natura Impact Statement alongside it.

### What changes for EIA on 26 November 2026?

Applications lodged from that date come under the Planning and Development Act 2024 and new regulations. The mandatory thresholds change, for example from more than 500 homes to more than 750, and a lower band is added: below it, the authority only examines the project's nature and location. Applications lodged before midnight on 25 November keep the old Schedule 5 thresholds.

### What is the EIA Portal?

The Department of Housing's EIA Portal is a public website listing applications for development consent that need an EIA. Since the 2018 Regulations, a developer must send the project's details to the portal before applying, and the portal's confirmation goes in with the application, so the public can find every EIA project in one place.

### Who decides on an EIA in Ireland?

The competent authority for the consent: usually the local planning authority, An Coimisiún Pleanála for appeals and strategic infrastructure, and the EPA where the EIA relates to an EPA licence. The EPA is also a statutory consultee on applications with an EIAR, and An Coimisiún Pleanála replaced An Bord Pleanála on 18 June 2025.

### What is a non-technical summary?

A short, plain-language summary of the EIAR that anyone can read without the technical chapters. The EU directive requires one in every EIAR. It describes the project, its likely significant effects and the measures to avoid or reduce them, so that anyone can follow the main findings without the technical detail.

### What does Verdé need to start?

Four things: the site location with a red-line boundary, a description of the project and its size, any planning history or pre-application feedback, and the programme for lodging the application. With those, Verdé checks the thresholds, advises on screening or scoping and the chapters it can write, and replies within one working day.

## Sources and further reading

1. [Directive 2014/52/EU amending the EIA Directive 2011/92/EU](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32014L0052)EUR-Lex, Official Journal of the European Union , 2014 . The EIA process, the factors an EIAR covers and competent experts.
2. [European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018, S.I. 296 of 2018](https://www.irishstatutebook.ie/2018/en/si/0296.html)Irish Statute Book , 2018 . The EIAR in Irish planning law from 1 September 2018, and the EIA Portal.
3. [Planning and Development (Part 6) (Screening Classes, Thresholds, Criteria and Examination) Regulations 2026](https://assets.gov.ie/static/documents/f7d72ca2/Planning_and_Development_Part_6_Screening_Classes_Thresholds_Criteria_and_Examination_Regulations_2026.pdf)Department of Housing, Local Government and Heritage , 2026 . The thresholds for applications lodged from 26 November 2026.
4. [Current EIA screening thresholds (Schedule 5, Part 2)](https://consult.housing.gov.ie/en/system/files/materials/8/Current%20Environmental%20Impact%20Assessment%20Screening%20Thresholds.pdf)Department of Housing, Local Government and Heritage , checked 24 November 2026 . The thresholds for applications lodged up to 25 November 2026.
5. [Environmental Impact Assessment](https://www.epa.ie/our-services/monitoring--assessment/assessment/environmental-impact-assessment/)Environmental Protection Agency , checked 24 November 2026 . What EIA is, sub-threshold projects and the EPA’s role.
6. [Guidelines on the information to be contained in Environmental Impact Assessment Reports](https://www.epa.ie/publications/monitoring--assessment/assessment/guidelines-on-the-information-to-be-contained-in-environmental-impact-assessment-reports-eiar.php)Environmental Protection Agency , 2022 . What each EIAR chapter should contain.
7. [EIA Portal](https://www.gov.ie/en/department-of-housing-local-government-and-heritage/services/eia-portal)Department of Housing, Local Government and Heritage , checked 24 November 2026 . Where EIA applications are listed and applicants register.
8. [Confirmation of the commencement date for the 2024 Act](https://www.gov.ie/en/department-of-housing-local-government-and-heritage/publications/confirmation-of-the-commencement-date-for-the-2024-act/)Department of Housing, Local Government and Heritage , 2026 . The 2024 Act and its regulations apply to applications lodged from 26 November 2026.

## What happens when you send the project details

What we ask for

- Site location with a red-line boundary
- A description of the project and its size
- Any planning history or pre-application feedback
- The programme for lodging the application

Reply

Within one working day, with the thresholds that apply, screening or scoping advice and the chapters Verdé can write.

[Send the project details](https://verde.ie/contact?service=environmental-impact-assessment)

[Call 01 201 1260](tel:+35312011260)

Phone  [01 201 1260](tel:+35312011260)  or email  [info@verde.ie](mailto:info@verde.ie)

## Verdé guides on EIA and Appropriate Assessment

- [Environmental Impact Assessment: Verdé’s guide EIA and the EIAR from design to decision.](https://verde.ie/news/environmental-impact-assessment)
- [Appropriate Assessment: what it is and when it applies The Habitats Directive test explained.](https://verde.ie/news/appropriate-assessment)

## Related Verdé services

- [Appropriate Assessment screening and Natura Impact Statements in Ireland The separate Natura 2000 test.](https://verde.ie/services/appropriate-assessments)
- [Hydrogeology in Ireland: abstraction, models, protection, monitoring Water chapters and groundwater models.](https://verde.ie/services/water-hydrogeology)
- [Noise, air, odour and vibration assessments in Ireland Air quality and noise chapters.](https://verde.ie/services/air-noise-acoustics)
- [Contaminated land in Ireland: find it, assess it, fix it Land and soils evidence.](https://verde.ie/services/contaminated-land)
- [Environmental monitoring and compliance in Ireland Monitoring that planning conditions set.](https://verde.ie/services/environmental-monitoring)
- [Environmental consultancy in Ireland, from first survey to sign-off Every Verdé service by project stage.](https://verde.ie/services/environmental-consultancy)

Sectors we work in

- [Construction](https://verde.ie/sectors/construction)
- [Renewables](https://verde.ie/sectors/renewables)
- [Quarries and aggregates](https://verde.ie/sectors/quarries-and-aggregates)
- [Data centres](https://verde.ie/sectors/data-centres)
- [Energy and electricity](https://verde.ie/sectors/energy-and-electricity)
- [Public sector](https://verde.ie/sectors/public-sector)