---
title: Food & Drink Environmental Consultants Ireland | Verdé
description: Environmental consultants for Irish dairies, breweries, distilleries and food plants: class 7 licence thresholds, trade effluent, water abstraction and odour.
canonical: https://verde.ie/sectors/food-drink
updated: 2026-11-03
author: Verdé Environmental Group
---
# Food & drink licensing, effluent and water for processors and distillers

A dairy that receives more than 200 tonnes of milk a day, averaged over the year, falls in class 7.2.1 of the EPA Act’s [First Schedule](https://www.epa.ie/publications/licensing--permitting/industrial/ipc/First-Schedule-of-EPA-Act-1992-as-amended---V5-Peat-Regs-updates.pdf) and needs an EPA licence.

Last updated 3 November 2026 by Verdé Environmental Group

## Key takeaways

- Dairies receiving over 200 tonnes of milk a day need an EPA licence.
- Breweries need one above 25 million litres a year; distilleries above 1,500 tonnes of pure alcohol.
- Effluent to the sewer needs an Uisce Éireann licence; to a river, a Section 4 licence.
- Abstracting 25 m³ of water on any day means registering it with the EPA.

Cutaway of a food and drink production plant: process water use, effluent treatment and the point where the discharge is monitored.

## What environmental support does a food or drink producer need?

Mostly four things: whether the plant needs an EPA licence at its size, a licence for its effluent, registration or a licence for the water it takes, and evidence when a neighbour complains about odour or noise. We cover all four, and investigate when process water gets where it should not.

Verdé supports Ireland’s food, dairy and distilling operators with IE licensing, trade effluent and discharge licences, water resource assessment and environmental due diligence.

### Typical challenges we solve

- IE and IPC licence applications and reviews
- Trade effluent and discharge licence applications
- Water abstraction licensing and resource assessment
- Odour, noise and air-quality assessment

This page is for dairies, breweries, distilleries, meat plants and other food and drink producers in Ireland. It covers environmental licensing, effluent, water and nuisance, not food safety or HACCP.

### Services in this sector

- [IPPC / IE Licensing](https://verde.ie/services/ippc-waste-licensing)
- [Water & Hydrogeology](https://verde.ie/services/water-hydrogeology)
- [Air, Noise & Acoustics](https://verde.ie/services/air-noise-acoustics)

### Response times

New enquiries: a reply within one working day. Spills and pollution incidents: call [0818 714 002](tel:0818714002) at any hour, and the duty engineer confirms the response on the call.

## Is this right for you?

### This is a fit if

- You run a dairy, brewery, distillery, meat plant or food factory near a class 7 threshold.
- You need a trade effluent or Section 4 discharge licence.
- You need to register or license a water abstraction.
- A neighbour, the council or the EPA has raised odour or noise.

### This is not a fit if

- You need food safety, HACCP or labelling advice.
- You need process or refrigeration engineering.

For food safety, start with the Food Safety Authority of Ireland. For the environmental side of the plant, we can help.

## Does a dairy, brewery or distillery need an EPA licence?

It does above set capacities in class 7 of the First Schedule: for example, receiving more than 200 tonnes of milk a day, brewing more than 25 million litres a year, or distilling more than 1,500 tonnes of pure alcohol a year. The EPA decides each case.

**How the class 7 check decides**

Table: EPA licence thresholds for food and drink activities

| What you enter | Threshold | What it triggers |
| --- | --- | --- |
| Milk received, average day over the year | more than 200 t a day | class 7.2.1 |
| Dairy product capacity, as milk equivalent | more than 50 million gallons a year | class 7.2.2 |
| Production capacity | more than 25 million litres a year | class 7.3.1 |
| Production capacity, as pure alcohol | more than 1,500 t a year | class 7.3.2 |
| Production capacity | more than 100,000 t a year | class 7.3.3 |
| Carcass production capacity | more than 50 t a day | class 7.4.1 |
| Daily slaughter capacity, in units | more than 1,500 units a day | class 7.4.2 |
| Finished product capacity | more than 75 t a day | class 7.8 |
| Finished product capacity | more than 300 t a day | class 7.8 |

Thresholds from class 7 of the [First Schedule to the EPA Act 1992](https://www.epa.ie/publications/licensing--permitting/industrial/ipc/First-Schedule-of-EPA-Act-1992-as-amended---V5-Peat-Regs-updates.pdf). The EPA decides each case.

Planning has its own thresholds. An EIA report is mandatory for dairy processing above 50 million gallons of milk equivalent a year, brewing and distilling above 100,000 tonnes a year, and slaughterhouses above 1,500 units a day ([Schedule 5](https://consult.housing.gov.ie/en/system/files/materials/8/Current%20Environmental%20Impact%20Assessment%20Screening%20Thresholds.pdf)).

## Who licenses a food plant’s wastewater?

It depends where the water goes. Trade effluent to the public sewer needs a licence from Uisce Éireann, which names food and drink among the sectors it licenses, or an EPA licence. Effluent to a river or stream needs a Section 4 licence from the local authority, unless an EPA licence covers it.

**Figure: Where a food plant’s water comes from and goes.** Flow diagram: water in at 25 or 2,000 m³ a day, out to the sewer under Section 16 or to a river under Section 4.

The licences that attach to water coming into and leaving a food or drink plant. An EPA licence, where the site holds one, can cover the discharges instead. Source: [Uisce Éireann](https://water.ie/business/trade-effluent/about).

Table: Data behind this graphic: water routes and their licences

| Route | Threshold or rule | Who licenses it | Source |
| --- | --- | --- | --- |
| Water in, from a well, river or lake | 25 m³ or more in any 24 hours: register | EPA | EPA |
| Water in, from a well, river or lake | 2,000 m³ or more in any 24 hours: licence | EPA | EPA |
| Effluent out, to the public sewer | Trade effluent licence, Section 16 | Uisce Éireann, or the EPA | Uisce Éireann |
| Effluent out, to a river or stream | Section 4 licence | Local authority, or the EPA | Dublin City Council |

Uisce Éireann grants trade effluent licences under Section 16 of the Local Government (Water Pollution) Acts 1977 and 1990, and discharging trade effluent without one is an offence ([Uisce Éireann](https://water.ie/business/trade-effluent/about)). Section 4 licences for discharges to waters come under the same Acts ([Dublin City Council](https://www.dublincity.ie/environment-and-climate-action/protecting-against-water-pollution/discharge-licences)). We prepare the applications ([licensing](https://verde.ie/services/ippc-waste-licensing)).

## Does a food or drink plant need to register its water abstraction?

If it takes 25 cubic metres or more in any 24 hours, yes: the abstraction is registered with the EPA, which then decides whether a licence is needed. From 2,000 cubic metres in any 24 hours a licence is required. The busiest day counts, not the average.

The thresholds are on the [EPA’s abstraction page](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/). We characterise the source, test its yield and prepare the registration or licence dossier ([water and hydrogeology](https://verde.ie/services/water-hydrogeology)).

## How are odour and noise complaints about a food plant assessed?

With measured evidence. Odour around a licensed site is assessed with the EPA’s AG5 field method, alongside olfactometry, community panels and dispersion modelling, and noise is surveyed at the nearest homes to the EPA’s NG4 guidance. The results show whether the plant is the source, and by how much.

The methods are in the EPA’s [AG5 odour guidance](https://www.epa.ie/publications/compliance--enforcement/air/air-guidance-notes/AG5-2021.pdf) and [NG4 noise guidance](https://www.epa.ie/publications/monitoring--assessment/noise/guidance-note-for-noise-licence-applications-surveys-and-assessments-in-relation-to-scheduled-activities-ng4.php). Our [air, noise and acoustics](https://verde.ie/services/air-noise-acoustics) page covers which applies to a planning condition, a licence or a complaint.

## What happens if process water reaches land or a stream?

Contain it first, then find out what it reached. A Phase II site assessment samples the soil and the stream, compares the results with assessment criteria and builds a conceptual site model of source, pathway and receptor. We carried one out after a discharge of process wash water to nearby land.

- **2023**: [Phase II site assessment after a process wash water discharge](https://verde.ie/projects/phase-ii-environmental-site-assessment) Soil and stream samples taken after wash water reached nearby land; Results compared with assessment criteria for soil and groundwater; A conceptual site model of source, pathway and receptor

If a river or stream is affected, report it: our [contaminated land](https://verde.ie/services/contaminated-land) page sets out how the investigation and any clean-up proceed.

## What changes the job at a food or drink plant?

Size first, then water: the plant’s capacity decides whether class 7 applies, and where its water comes from and goes to decides which other licences it needs. A complaint or an incident adds evidence on top.

### If this is true of your plant

- **If a dairy receives more than 200 tonnes of milk a day, averaged over the year**: then it falls in class 7.2.1 and needs an EPA licence.
- **If process effluent goes to the public sewer**: then it needs a trade effluent licence from Uisce Éireann, or an EPA licence.
- **If effluent goes to a river or stream**: then it needs a Section 4 licence from the local authority, unless an EPA licence covers it.
- **If the plant abstracts 25 m³ of water or more on any day**: then the abstraction must be registered with the EPA; at 2,000 m³ it needs a licence.

Table: How Verdé compares on what food and drink producers weigh up

| Criterion | Verdé | What it means for you |
| --- | --- | --- |
| Licensing | EPA licence, trade effluent and Section 4 applications | Every authorisation for the site from one team. |
| Water | Abstraction registration and licence dossiers | The busiest day measured, not guessed. |
| Odour and noise | AG5 odour assessment and NG4 noise surveys | Evidence that settles a complaint either way. |
| Incidents | Phase II site assessment after a discharge | Soil and stream results with a conceptual site model. |
| Staffed offices | Kilcoole, Castlebar and Cork | Teams in the east, west and south. |

## Food and drink questions we are asked most

Still have a question? Call [01 201 1260](tel:+35312011260) or email [info@verde.ie](mailto:info@verde.ie).

### Does a dairy or distillery in Ireland need an EPA licence?

Above set capacities, yes. A dairy receiving more than 200 tonnes of milk a day, averaged over the year, falls in class 7.2.1 of the First Schedule, and dairy product capacity above 50 million gallons of milk equivalent a year in class 7.2.2. A distillery needs one above 1,500 tonnes of pure alcohol a year. The EPA decides each case.

### What are the EPA licence thresholds for breweries and maltings?

Brewing, including cider and perry, falls in class 7.3.1 of the First Schedule above a production capacity of 25 million litres a year. Malting falls in class 7.3.3 above 100,000 tonnes a year. Activities in the schedule need an EPA licence. Below those sizes, trade effluent, discharge and water abstraction rules can still apply to the site.

### Does a slaughterhouse need an EPA licence?

It does above either of two thresholds. Class 7.4.1 covers slaughterhouses with a carcass production capacity above 50 tonnes a day. Class 7.4.2 covers slaughter above 1,500 units a day, where one sheep counts as 1 unit, one pig as 2 and one head of cattle as 5. At planning stage, more than 1,500 units a day also means a mandatory EIA report.

### Who licenses wastewater from a food plant?

Uisce Éireann licenses trade effluent going to its sewers, and names food and drink among the sectors that need one; an EPA licence can cover it instead. A discharge to a river or stream is licensed by the local authority under Section 4, again unless the EPA licence covers it. Discharging trade effluent without a licence is an offence. Verdé prepares the applications.

### Does a food plant need to register its water abstraction?

Yes, if it takes 25 cubic metres or more in any 24 hours. The abstraction is registered with the EPA, which then decides whether a licence is needed. From 2,000 cubic metres in any 24 hours a licence is required. The busiest day counts, so a seasonal plant can cross the threshold even with a low average.

### How is an odour complaint about a food plant assessed?

With measurements, not impressions. Around a licensed site, odour is assessed with the EPA’s AG5 field method, alongside olfactometry, community panels and dispersion modelling, which together show how far odour travels and how strong it is at nearby homes. Noise complaints are surveyed at the nearest homes to the EPA’s NG4 guidance. Verdé carries out both.

### Does a new dairy or brewery need an EIA report?

An EIA report is mandatory for dairy processing above 50 million gallons of milk equivalent a year, and for brewing and distilling above 100,000 tonnes a year, under Schedule 5 of the Planning and Development Regulations. Smaller plants are screened to decide whether one is needed. Verdé prepares EIAR chapters on water, soils and noise.

## Terms used on this page

- **Milk equivalent**: Milk equivalent expresses a dairy product as the quantity of milk used to make it.
- **Slaughter units**: Units weight slaughter capacity by animal: one sheep is 1 unit, one pig 2 and one head of cattle 5.
- **Trade effluent**: Trade effluent is any liquid waste discharged from a business premises to the public sewers.
- **Section 4 licence**: A Section 4 licence, from the local authority, allows a discharge of effluent to waters such as a river.
- **Olfactometry**: Olfactometry measures odour concentration by diluting air samples for a trained panel.

## Sources and further reading

1. [First Schedule to the EPA Act 1992, as amended](https://www.epa.ie/publications/licensing--permitting/industrial/ipc/First-Schedule-of-EPA-Act-1992-as-amended---V5-Peat-Regs-updates.pdf)Environmental Protection Agency, checked 3 November 2026. The activity classes and capacity thresholds that bring a site under an EPA licence.
2. [Current EIA screening thresholds (Schedule 5, Part 2)](https://consult.housing.gov.ie/en/system/files/materials/8/Current%20Environmental%20Impact%20Assessment%20Screening%20Thresholds.pdf)Department of Housing, Local Government and Heritage, checked 3 November 2026. The project sizes above which an EIA report is mandatory.
3. [About trade effluent](https://water.ie/business/trade-effluent/about)Uisce Éireann, checked 3 November 2026. Who needs a trade effluent licence to discharge to the public sewer.
4. [Discharge licences](https://www.dublincity.ie/environment-and-climate-action/protecting-against-water-pollution/discharge-licences)Dublin City Council, checked 3 November 2026. Section 4 licences for discharges to waters and Section 16 licences for discharges to sewer.
5. [Do I need to register or apply for a licence?](https://www.epa.ie/our-services/licensing/freshwater--marine/water-abstraction/do-i-need-to-register-or-apply-for-a-licence/)Environmental Protection Agency, checked 3 November 2026. The 25 and 2,000 cubic metre a day water abstraction thresholds.
6. [Odour Impact Assessment Guidance for EPA Licensed Sites (AG5)](https://www.epa.ie/publications/compliance--enforcement/air/air-guidance-notes/AG5-2021.pdf)Environmental Protection Agency, 2021 edition. The field method for assessing odour around licensed sites.
7. [Guidance Note for Noise: licence applications, surveys and assessments (NG4)](https://www.epa.ie/publications/monitoring--assessment/noise/guidance-note-for-noise-licence-applications-surveys-and-assessments-in-relation-to-scheduled-activities-ng4.php)Environmental Protection Agency, 2016. The noise survey and assessment method for licensed sites.

## Tell us about the plant

### What we ask for

- The site address
- What the plant makes, and its capacity
- Your licence or discharge permit details, if any
- Recent monitoring results
- Any issue raised by the EPA, the council or a neighbour

### Reply

Within one working day.

For a spill or pollution incident, phone [0818 714 002](tel:0818714002) at any hour. The duty engineer confirms the response on the call.

[Send your plant enquiry](https://verde.ie/contact?sector=food-drink)

[Call 0818 714 002](tel:0818714002)

Office [01 201 1260](tel:+35312011260) or [info@verde.ie](mailto:info@verde.ie)

## Related pages

- [EPA and IPC licensing](https://verde.ie/services/ippc-waste-licensing): EPA licences and trade effluent applications.
- [Hydrogeology and groundwater](https://verde.ie/services/water-hydrogeology): Abstraction thresholds, yield testing and dossiers.
- [Air, noise and acoustics](https://verde.ie/services/air-noise-acoustics): Odour and noise to EPA guidance.
- [Contaminated land](https://verde.ie/services/contaminated-land): Investigation after a discharge or spill.
- [Agriculture & Agri-food](https://verde.ie/sectors/agriculture): Licensing and water for pig and poultry units.
- [Pharmaceutical & Life Sciences](https://verde.ie/sectors/pharmaceutical): Licensing and closure for regulated plants.
