Deep-well dewatering for a 10m dig on a 7,000m² Dublin 8 site, discharging about 3,000m³ a day under licence to the River Camac for 11 months.

![Construction Dewatering – Garda Ops Centre](/__l5e/assets-v1/3fa2e7f2-604e-4407-bddf-2c53a07451c2/construction-dewatering-garda-ops-centre.jpg)

Project narrative

Construction Dewatering @ Garda Security Crime Ops Centre, Dublin

Construction dewatering design, installation and management at the Garda Security Crime Operations Centre, Dublin 8, Ireland. The development was undertaken by the client, John Paul Construction.

Dewatering infrastructure installation, including ring main system and deep well installations

pH and suspended solids treatment & control

Discharge water quality sampling & monitoring

Active discharge under licence to the adjacent River Camac

Dewatering - John Paul Construction - Garda Security Ops Centre

Verde provided construction dewatering services for John Paul Construction at the Garda Security Crime Ops Centre, Dublin 8. The site was across 7,000m2 and involved a 10 metre dig with shallow seccant wall construction to facilitate the installation.

Verde provided dewatering operations and discharge licence control through deep well dewatering. Daily discharge levels were approx. 3,000m3 per day. The project was in operation for 11 months.

Delivered under

- [Construction dewatering](https://verde.ie/services/construction-dewatering)

Discuss a similar project

[Start a conversation](https://verde.ie/contact)

Keep reading

## Related case studies

[All 22 case studies](https://verde.ie/projects#case-studies)

[Construction Dewatering Construction Dewatering – Profile Park, Dublin Water control for the first two phases of a 22-acre, 52MW data centre campus at Profile Park, Dublin, from licensing to compliance monitoring.](https://verde.ie/projects/construction-dewatering-profile-park)

[Construction Dewatering Construction Dewatering – 137–140 Abbey Street Upper, Dublin 1 Dewatering management, regulatory compliance and environmental monitoring for construction works in an urban setting at 137–140 Abbey Street Upper, Dublin 1.](https://verde.ie/projects/construction-dewatering-137-140-abbey-street-upper-dublin-1)

[Construction Dewatering Construction Dewatering – Ballymore Craddockstown Developments Limited, Kildare Ongoing construction dewatering with trade effluent treatment for pH and suspended solids on works at Tipper West, Naas, Co. Kildare. Verdé case study, 2025.](https://verde.ie/projects/construction-dewatering-ballymore-craddockstown-developments-limited-kildare)