Verde Environmental Consultants & Oil Leak Clean Up Specialists Projects | Verde - Complete Environmental Solutions
/ Projects

Projects

  • All
  • Air
  • Due Diligence
  • Environmental Services
  • Waste
  • Remediation
  • Noise
  • Licensing
  • Site Assessment
  • Risk Assessment
  • Soil
  • Water

Phase II Environmental Site Assessment

A Phase II Environmental Site Assessment includes gathering samples of soil or water (surface and ground), or both, at the property, to test for hazardous materials or environmen...
Read More

Environmental Services to Multiple Construction Sites Nationwide

Project Summary/Goals Verde Environmental Consultants are managing the environmental requirements for several construction sites throughout the country including: Ballymore...
Read More

Environmental Services – Terenure Redevelopment site

Verde's Role Construction and Demolition Waste Management Plan– Advise on key environmental obligations and waste management procedures that apply to contractor organisation...
Read More

Soil Waste Classification – Bray Primary Care Center

Verde's Role Excavation of fourteen trial pits; locations were selected at key strategic positions around the site and trial pits generally extended down to depths of betwee...
Read More

Site Investigation and Waste Classification of In-situ Soil Material

Verde's Role Drilling of 19 boreholes in the grounds of the proposed developments including boreholes within existing building basements. These included 7 shallow borehol...
Read More

Noise Monitoring – Baseline and Construction Phase

Project Summary / Goals Long term noise monitoring adjacent to a railway line to establish baseline pre-construction noise conditions and noise levels during the constructio...
Read More

Tier 2 Hydrogeological Assessment

Verde's Role The works involved an assessment of the site geological and hydrogeological properties by use of trial pitting and groundwater monitoring well installations....
Read More

Deployment of Silt Curtains on River Shannon

Project The Shannon Flood Risk Group took a major decision in 2016 to develop a plan for a strategic maintenance programme on the River Shannon.  Programmed maintenance works ha...
Read More

OHSAS 18001 Audit Preparation

Project Summary/Goals Verde offer assistance to companies in the registration and maintenance of their occupational health and safety management system (OHS). The OHSAS 18001:20...
Read More

Residential Noise Complaint Assessment

Project Summary/Goals This project involved long term monitoring to investigate a noise complaint from a resident adjacent to the GSK Cork site. The subject site operates under ...
Read More

Industrial Emissions Licence (IE) Application Support

Project Summary/Goals This project involved the application/ update of Janssen’s existing EPA licence to bring it into compliance with the provisions of the industrial Emissions...
Read More

Environmental Site Assessment

Project Summary/Goals Completed a Phase 1 Environmental Site Assessment of a former industrial site in Berlin on behalf of a developer client active in the ever growing German p...
Read More

Groundwater Development for Anaerobic Digester Plant

Project Summary/Goals This project involved design, development and testing of groundwater resources to augment the water supply for an anaerobic digester plant located in disus...
Read More

Soil, Geology & Hydrogeology Chapter for EIS

Project Summary/Goals This project involved preparation of soil, geology and hydrogeology Chapters for an EIS for a proposed Phase 2 development of Anaerobic Digester located in...
Read More

Air and Occupational Hygiene Monitoring

Project Summary/Goals This project involved the monitoring of air quality at a site in Derry. Monitoring was completed prior to the development of a neighbouring biomass plant ...
Read More

Groundwater Resources Development

Project Summary/Goals This project involved examining the existing well field on the caravan park and developing a hydrogeological assessment to examine the potential of providi...
Read More

Lake Water Quality Monitoring

Project Summary/Goals This project involves undertaking set monthly monitoring Programmes of lakes throughout County Clare and Wicklow as part of the Water Framework Directive r...
Read More

Hydrogeological and Appropriate Assessment

Project Summary/Goals This project involved examining the suitability of a greenfield site for use as a cemetery development. The site investigation works obtained the required ...
Read More

Soil Waste Assessment & Classification

Project Summary/Goals This project involved site assessment to examining potential oil impact following a substantial fire at the premises. The site investigation works obtained...
Read More

Soil Waste Classification

Project Summary/Goals Verde was commissioned by the Client to carry out waste classification of soils excavated during recent site redevelopment. Based on our findings of t...
Read More

IPC Timber Site Remediation

Project Summary/Goals The site was used for the treatment of timber with creosote from the 1970s until 2000, since which time it has been unoccupied. At the height of its prod...
Read More

IPC Compliance Support Services

Project Summary/Goals The Quinn Group was established in 1973 and today it operates a number of sites including Cement manufacturing, Packaging manufacturing, landfill, power ...
Read More

Brownfield Site Investigation

Project Summary/Goals A former commercial/industrial site was under consideration for redevelopment. A potential purchaser commissioned an environmental report which identifie...
Read More

Waste Water Treatment

Project Summary/Goals Verde provided assistance with planning application for a wastewater treatment system associated with a residential environment in a sensitive karst envi...
Read More

IPC Licence Environmental Consultancy and Remediation Services

Project Summary/Goals Verde provide J&J with Environmental Consultancy and Advisory services, the aim of which is to provide the necessary environmental monitoring works to ...
Read More

Specialist Contractor for Oil Contamination Insurance Claims

Project Summary/Goals Oil release cover is included under insurance policies taken out by properties owned by private individuals, commercial entities and government bodies.  ...
Read More

IPC Compliance Support Services

Project Summary/Goals Established in 1964 IIE are Ireland’s sole manufacturer of explosives for the quarry, mining and civil engineering sectors. Their manufacturing site in C...
Read More

Environmental Due Diligence

Project Summary/Goals Verde provided ABN Amro with Environmental Consultancy and Advisory services. Verde carried out the necessary due diligence environmental assessment work...
Read More

Contaminated Site Management

Project Summary/Goals Following a comprehensive site investigation and assessment of a former Tannery and consultations with both the client and regulatory authorities, a reme...
Read More

Environmental Risk Assessment

Project Summary/Goals Verde provided environmental consultancy services to PHM Consulting in a planning application to Tipperary Co. Council involving the extension of Thurles...
Read More

Environmental Advisory and Support services

Project Summary/Goals With over 330 service stations across the country, Topaz is Ireland’s largest fuel and convenience brand. Topaz transport, store and trade hazardous and ...
Read More

Oil Spill Remediation Services – Fracture in fuel line

Project Summary/Goals A release of 4,500 litres of light fuel oil occurred from a fracture in a fuel line inside a plant room. The loss impacted the plant room and adjoining p...
Read More

Environmental Consultancy Services

Project Summary/Goals Verde provide IDL with Environmental Consultancy and Advisory services, the aim of which is to provide the necessary environmental monitoring works to sa...
Read More

Environmental Risk Assessment

Project Summary/Goals Verde were commissioned by Limerick City & Co. Council to undertake Site Investigations, Risk Assessment and development of a remediation programme for...
Read More
Top