Phase II Environmental Site Assessment
A Phase II Environmental Site Assessment includes gathering samples of soil or water (surface and ground), or both, at the property, to test for hazardous materials or environmen...
Read More

Environmental Services to Multiple Construction Sites Nationwide
Project Summary/Goals
Verde Environmental Consultants are managing the environmental requirements for several construction sites throughout the country including:
Ballymore...
Read More

Environmental Services – Terenure Redevelopment site
Verde's Role
Construction and Demolition Waste Management Plan– Advise on key environmental obligations and waste management procedures that apply to contractor organisation...
Read More

Soil Waste Classification – Bray Primary Care Center
Verde's Role
Excavation of fourteen trial pits; locations were selected at key strategic positions around the site and trial pits generally extended down to depths of betwee...
Read More

Site Investigation and Waste Classification of In-situ Soil Material
Verde's Role
Drilling of 19 boreholes in the grounds of the proposed developments including boreholes within existing building basements.
These included 7 shallow borehol...
Read More

Noise Monitoring – Baseline and Construction Phase
Project Summary / Goals
Long term noise monitoring adjacent to a railway line to establish baseline pre-construction noise conditions and noise levels during the constructio...
Read More

Tier 2 Hydrogeological Assessment
Verde's Role
The works involved an assessment of the site geological and hydrogeological properties by use of trial pitting and groundwater monitoring well installations....
Read More

Deployment of Silt Curtains on River Shannon
Project
The Shannon Flood Risk Group took a major decision in 2016 to develop a plan for a strategic maintenance programme on the River Shannon. Programmed maintenance works ha...
Read More

OHSAS 18001 Audit Preparation
Project Summary/Goals
Verde offer assistance to companies in the registration and maintenance of their occupational health and safety management system (OHS). The OHSAS 18001:20...
Read More

Residential Noise Complaint Assessment
Project Summary/Goals
This project involved long term monitoring to investigate a noise complaint from a resident adjacent to the GSK Cork site. The subject site operates under ...
Read More

Industrial Emissions Licence (IE) Application Support
Project Summary/Goals
This project involved the application/ update of Janssen’s existing EPA licence to bring it into compliance with the provisions of the industrial Emissions...
Read More

Environmental Site Assessment
Project Summary/Goals
Completed a Phase 1 Environmental Site Assessment of a former industrial site in Berlin on behalf of a developer client active in the ever growing German p...
Read More

Groundwater Development for Anaerobic Digester Plant
Project Summary/Goals
This project involved design, development and testing of groundwater resources to augment the water supply for an anaerobic digester plant located in disus...
Read More

Soil, Geology & Hydrogeology Chapter for EIS
Project Summary/Goals
This project involved preparation of soil, geology and hydrogeology Chapters for an EIS for a proposed Phase 2 development of Anaerobic Digester located in...
Read More

Air and Occupational Hygiene Monitoring
Project Summary/Goals
This project involved the monitoring of air quality at a site in Derry.
Monitoring was completed prior to the development of a neighbouring biomass plant ...
Read More

Groundwater Resources Development
Project Summary/Goals
This project involved examining the existing well field on the caravan park and developing a hydrogeological assessment to examine the potential of providi...
Read More

Lake Water Quality Monitoring
Project Summary/Goals
This project involves undertaking set monthly monitoring Programmes of lakes throughout County Clare and Wicklow as part of the Water Framework Directive r...
Read More

Hydrogeological and Appropriate Assessment
Project Summary/Goals
This project involved examining the suitability of a greenfield site for use as a cemetery development. The site investigation works obtained the required ...
Read More

Soil Waste Assessment & Classification
Project Summary/Goals
This project involved site assessment to examining potential oil impact following a substantial fire at the premises. The site investigation works obtained...
Read More

Soil Waste Classification
Project Summary/Goals
Verde was commissioned by the Client to carry out waste classification of soils excavated during recent site redevelopment.
Based on our findings of t...
Read More

IPC Timber Site Remediation
Project Summary/Goals
The site was used for the treatment of timber with creosote from the 1970s until 2000, since which time it has been unoccupied. At the height of its prod...
Read More

IPC Compliance Support Services
Project Summary/Goals
The Quinn Group was established in 1973 and today it operates a number of sites including Cement manufacturing, Packaging manufacturing, landfill, power ...
Read More

Brownfield Site Investigation
Project Summary/Goals
A former commercial/industrial site was under consideration for redevelopment. A potential purchaser commissioned an environmental report which identifie...
Read More

Waste Water Treatment
Project Summary/Goals
Verde provided assistance with planning application for a wastewater treatment system associated with a residential environment in a sensitive karst envi...
Read More

IPC Licence Environmental Consultancy and Remediation Services
Project Summary/Goals
Verde provide J&J with Environmental Consultancy and Advisory services, the aim of which is to provide the necessary environmental monitoring works to ...
Read More

Specialist Contractor for Oil Contamination Insurance Claims
Project Summary/Goals
Oil release cover is included under insurance policies taken out by properties owned by private individuals, commercial entities and government bodies. ...
Read More

IPC Compliance Support Services
Project Summary/Goals
Established in 1964 IIE are Ireland’s sole manufacturer of explosives for the quarry, mining and civil engineering sectors. Their manufacturing site in C...
Read More

Environmental Due Diligence
Project Summary/Goals
Verde provided ABN Amro with Environmental Consultancy and Advisory services. Verde carried out the necessary due diligence environmental assessment work...
Read More

Contaminated Site Management
Project Summary/Goals
Following a comprehensive site investigation and assessment of a former Tannery and consultations with both the client and regulatory authorities, a reme...
Read More

Environmental Risk Assessment
Project Summary/Goals
Verde provided environmental consultancy services to PHM Consulting in a planning application to Tipperary Co. Council involving the extension of Thurles...
Read More

Environmental Advisory and Support services
Project Summary/Goals
With over 330 service stations across the country, Topaz is Ireland’s largest fuel and convenience brand. Topaz transport, store and trade hazardous and ...
Read More

Oil Spill Remediation Services – Fracture in fuel line
Project Summary/Goals
A release of 4,500 litres of light fuel oil occurred from a fracture in a fuel line inside a plant room. The loss impacted the plant room and adjoining p...
Read More

Environmental Consultancy Services
Project Summary/Goals
Verde provide IDL with Environmental Consultancy and Advisory services, the aim of which is to provide the necessary environmental monitoring works to sa...
Read More

Environmental Risk Assessment
Project Summary/Goals
Verde were commissioned by Limerick City & Co. Council to undertake Site Investigations, Risk Assessment and development of a remediation programme for...
Read More