Source: https://verde.ie/projects

# Environmental project case studies Twenty-four years, nationwide delivery, one accountable team.

Consultancy, remediation, dewatering and renewable energy commissions delivered the length and breadth of Ireland — each one led by the same multidisciplinary team from first survey to sign-off.

Experience

24+ years

Offices

Three

Disciplines

12

Coverage

Nationwide

Home heating oil spill or fuel leak right now? Don't keep scrolling — we can be moving within the hour.

[Call 0818 714 002](tel:0818714002)

[Get help now](https://verde.ie/emergency)

Case studies

## Recent work.

22   projects

[Featured Solar PV 2025 Co. Wicklow Solar PV Commercial – Wicklow Design and installation of a 10.44kWp solar PV system at commercial premises in Wicklow, with hybrid inverters ready for storage batteries later. Read case study](https://verde.ie/projects/solar-pv-commercial-wicklow)

[Construction Dewatering 2025 · Profile Park, Dublin Construction Dewatering – Profile Park, Dublin Water control for the first two phases of a 22-acre, 52MW data centre campus at Profile Park, Dublin, from licensing to compliance monitoring. Read case study](https://verde.ie/projects/construction-dewatering-profile-park)

[Construction Dewatering 2025 · Dublin 1 Construction Dewatering – 137–140 Abbey Street Upper, Dublin 1 Dewatering management, regulatory compliance and environmental monitoring for construction works in an urban setting at 137–140 Abbey Street Upper, Dublin 1. Read case study](https://verde.ie/projects/construction-dewatering-137-140-abbey-street-upper-dublin-1)

[Construction Dewatering 2025 · Naas, Co. Kildare Construction Dewatering – Ballymore Craddockstown Developments Limited, Kildare Ongoing construction dewatering with trade effluent treatment for pH and suspended solids on works at Tipper West, Naas, Co. Kildare. Verdé case study, 2025. Read case study](https://verde.ie/projects/construction-dewatering-ballymore-craddockstown-developments-limited-kildare)

[Solar PV 2025 · Dublin city centre 94kWp Solar PV Commercial – Dublin A 94kWp solar PV system on two roofs 35m up on a Dublin city centre building, with a scheduled crane lift, a G10 switch and linear heat detection. Read case study](https://verde.ie/projects/solar-pv-residential-dublin)

[Construction Dewatering 2024 · Dublin 8 Construction Dewatering – Garda Ops Centre Deep-well dewatering for a 10m dig on a 7,000m² Dublin 8 site, discharging about 3,000m³ a day under licence to the River Camac for 11 months. Read case study](https://verde.ie/projects/construction-dewatering-garda-ops-centre)

[Construction Dewatering 2024 · Trinity College Dublin Construction Dewatering – Trinity College, Dublin A discharge licence application and bespoke dewatering for an 8m double-basement dig on a 2,200m² site at the E3 Learning Foundry, Trinity College Dublin. Read case study](https://verde.ie/projects/construction-dewatering-trinity-college-dublin)

[Construction Dewatering 2024 · Ballsbridge, Dublin 4 Construction Dewatering – Meta HQ, Dublin Dewatering in clay and bedrock for a 14m treble-basement dig on a 10,000m² Dublin 4 site, with pH control and over 200 tonnes of sludge removed. Read case study](https://verde.ie/projects/construction-dewatering-meta-dublin)

[Solar PV 2024 · Castlebar, Co. Mayo Solar PV Residential – Castlebar, Mayo A 6.2kWp solar PV system on a slate roof in Castlebar, Co. Mayo, with 10kW of battery storage and optimisers to manage shading on the panels. Read case study](https://verde.ie/projects/solar-pv-residential-castlebar)

[Solar PV 2024 · Dublin Solar PV Residential – Dublin An 8.8kWp solar PV system with battery storage on the flat roof of a newly renovated Dublin home, fixed with specialised anchors and optimisers. Read case study](https://verde.ie/projects/solar-pv-residential-dublin-1)

[Oil Spill Response 2024 · Co. Westmeath Oil Spill Residential – Westmeath Emergency response and full remediation after about 600 litres of kerosene leaked under a Westmeath home, with 180 tonnes of contaminated material removed. Read case study](https://verde.ie/projects/oil-spill-residential-westmeath)

[Oil Spill Response 2024 · Co. Longford Oil Spill Residential – Longford Kerosene leaked from an underground oil line at a Longford home: floors broken out, foundation walls replaced and residual oil treated. Verdé case study, 2024. Read case study](https://verde.ie/projects/oil-spill-residential-longford)

[Oil Spill Response 2024 Oil Spill Midwestern Hospital Emergency response to a 4,500-litre fuel oil release in a hospital plant room, treating the ground so the physiotherapy department could reopen. Read case study](https://verde.ie/projects/oil-spill-midwestern-hospital)

[Hydrogeology & Water 2023 Hydrogeological and Appropriate Assessment Trial pits, groundwater wells and Appropriate Assessment screening under Article 6 of the Habitats Directive for a proposed cemetery on a greenfield site. Read case study](https://verde.ie/projects/hydrogeological-appropriate-assessment)

[Hydrogeology & Water 2023 · Co. Clare and Co. Wicklow Lake Water Quality Monitoring Monthly sampling of 19 lakes in Co. Clare and six in Co. Wicklow by boat-trained samplers, for Water Framework Directive monitoring programmes. Read case study](https://verde.ie/projects/lake-water-quality-monitoring)

[Hydrogeology & Water 2023 Groundwater Resources Development A new production well field for a caravan park: drilling supervision, pumping tests including 3-day tests, and advice on safe yields and treatment. Read case study](https://verde.ie/projects/groundwater-resources-development)

[Hydrogeology & Water 2023 · Co. Antrim Soil, Geology & Hydrogeology Chapter for EIS Production and monitoring wells, step tests and a 3-day constant rate pumping test for an anaerobic digester plant's groundwater abstraction licence. Read case study](https://verde.ie/projects/soil-geology-hydrogeology)

[Environmental Consultancy 2023 · Bray, Co. Wicklow Soil Waste Classification – Collen Construction 14 trial pits 2.0–3.0m deep, soil sampling and waste classification at a redevelopment site in Bray, Co. Wicklow, with advice on handling excavated soil. Read case study](https://verde.ie/projects/soil-waste-classification)

[Environmental Consultancy 2023 · Terenure, Dublin Environmental Services A demolition waste plan, soil waste classification, invasive species and asbestos surveys for a housing site in Terenure, Dublin. Verdé case study, 2023. Read case study](https://verde.ie/projects/environmental-services-soil)

[Environmental Consultancy 2023 Phase II Environmental Site Assessment A Phase II assessment of soil and a nearby stream after process wash water was discharged onto land, with a conceptual site model. Verdé case study, 2023. Read case study](https://verde.ie/projects/phase-ii-environmental-site-assessment)

[Environmental Consultancy 2023 Environmental Services to Multiple Construction Sites Nationwide Real-time noise and vibration monitoring, water sampling, waste management and site audits on construction sites, including service areas on the M6 and M9. Read case study](https://verde.ie/projects/environmental-services-to-multiple-construction-sites-nationwide)

[Air & Occupational Hygiene 2017 · Derry Ambient Air and Occupational Hygiene Monitoring Air quality and worker exposure monitoring at a Derry site in 2014 and again in 2017, beside a biomass plant, with real-time particulate monitoring. Read case study](https://verde.ie/projects/ambient-air-and-occupational-hygiene-monitoring)

Where we work

## Every county, one team.

Our locations

### Verdé offices

Verdé has three staffed offices in Ireland: Kilcoole, Co. Wicklow (head office and laboratory), Castlebar, Co. Mayo, and Cork. Galway is by appointment only, and our Lagos office serves work in Nigeria. Each is mapped from its published address. Select a location to view it on the map, or enter a full Eircode above to mark your site and identify the nearest team.