Some of our earliest experiences deploying MABR have been with packaged plants, in fact the first packaged MABR was build as far back as 2012. Today OxyMem have a number of flexible design options for our modular MABR system.
Packaged is Second Nature
Packaged units for various applications:
- Side stream treatment
- Temporary infrastructure / capacity
- Off-grid applications
- Tertiary applications
- Pre-treatment applications
- Large scale proof of concept
Built for Flexibility and Speed
When we ship MABR in a packaged format the average time on site for final assembly is 1-3 days. The seeding process will run between 4-6 weeks but this is managed remotely.
Deploying a packaged MABR delivers:
- Plug and play installation with short start-up period (In 4-6 weeks the unit fully operational)
- Fully automated with remote management
- Expandable design and enabling a more dynamic asset strategy
- Energy savings, a minimum four times saving on energy costs over CAS
- 50% reduction in sludge production (compared to CAS)
- Achieve more Process resilience