Oil Spill Remediation Services – Crack in Oil Tank

OLYMPUS DIGITAL CAMERA

Project

Oil Spill Remediation Services – Crack in Oil Tank

Location

Newbridge, Co. Kildare

Duration

4 Months

Damage Caused

  • An estimated loss of 150 litres of kerosene oil.
  • Oil contamination impact beneath the oil tank and boiler room.
  • Strong oil odours and elevated PID readings recorded in soils from surface to approximately 1.25mBGL.
  • Strong oil odours and elevated PID readings recorded in the rising blockwork of the garage.Elevated total TPH values recorded during laboratory analysis.

Verde’s Remediation & Reinstatement Programme

Enabling Works

  • Temporary removal of the oil tank.
  • Temporary heating supply set up.
  • Break out and removal of the concrete oil tank base.
  • Break out and removal of a section of concrete of the garage and boiler house.

 Remedial Works

  • Excavation and removal of identified contaminated soil and fill material beneath and surrounding the removed oil tank base and walls of the garage and boiler house.
  • Sampling and assessment of the exposed rising blockwork at the walls of the garage.
  • Removal and replacement of blockwork.
  • The soil in the base and sides of the excavation were perforated to allowed the effective distribution of specialist chemical and biological treatment solutions.
  • The application of a combination of chemical and biological treatment solutions to the inoculation network, base and sides of the excavation to treat residual contamination.

Reinstatement Works

  • The excavated area was backfilled using granular sub base material compacted at 150mm intervals.
  • Timber shuttering was installed prior to the pouring of a new concrete area.
  • A new concrete area was poured.
  • The oil tank and associated pipework were repositioned on the new concrete area and the heating system was recommissioned.
  • Final sampling undertaken to examine soil at the previously affected areas.
  • The area was tidied prior to demobilisation from site.
“Scoring Verde 10 out of 10 is not enough to show how excellently they undertook the remediation works of our oil tank leak.  Our Project Manager, Clare Whitely was excellent, as was all the remediation team who really impressed us. Their work was very neat and tidy and they left the area clean every evening.  I would certainly recommend them to anyone in our position.” More Testimonials 
CM, Newbridge, Co. Kildare

 

 