Air quality and worker exposure monitoring at a Derry site in 2014 and again in 2017, beside a biomass plant, with real-time particulate monitoring.

Project narrative
Continuous monitoring of particulate matter PM 10 , PM 5 and PM 1 within the site and at boundary locations. This included a telemetry connection to allow off-site viewing and real-time data analysis.
Long term monitoring of dust deposition around the site boundaries using the “Bergerhoff” method.
Intermittent monitoring of combustion gases (Carbon Dioxide, Nitrogen Oxides, Sulphur Dioxide), Acid Gases, Ozone, and Hydrocarbons in ambient air over fortnightly intervals.
Risk assessment and occupational hygiene monitoring of selected personnel.
Evaluation of results against baseline levels from 2014 and comparison with environmental and occupational standards.
Provision of recommendations and mitigation measures to minimise any potential environmental, occupational or nuisance effects.
This project involved the monitoring of air quality at a site in Derry.
Monitoring was completed prior to the development of a neighbouring biomass plant in 2014 and again in 2017 during the operation of the biomass plant to investigate potential environmental impacts worker occupational hygiene concerns.
The survey included an assessment of conditions against baseline conditions (2014) as well as an assessment against environmental and occupational legislative standards.
Keep reading
Related case studies
Solar PV
Solar PV Commercial – Wicklow
Design and installation of a 10.44kWp solar PV system at commercial premises in Wicklow, with hybrid inverters ready for storage batteries later.
Construction Dewatering
Construction Dewatering – Profile Park, Dublin
Water control for the first two phases of a 22-acre, 52MW data centre campus at Profile Park, Dublin, from licensing to compliance monitoring.
Construction Dewatering
Construction Dewatering – 137–140 Abbey Street Upper, Dublin 1
Dewatering management, regulatory compliance and environmental monitoring for construction works in an urban setting at 137–140 Abbey Street Upper, Dublin 1.