Water | Verde - Complete Environmental Solutions Water – Verde – Complete Environmental Solutions
/ Portfolio

Archives

Environmental Services to Multiple Construction Sites Nationwide

Project Summary/Goals Verde Environmental Consultants are managing the environmental requirements for several construction sites throughout the country including: Ballymore Eustace Water Treatment Plant (on behalf of Irish Water) Circle K Motorway Service Station development sites in Athlone (M6) and Kilcullen (M9) (on behalf of Killeen Civil Engineering) Verde role in the projec...
Read More

Tier 2 Hydrogeological Assessment

Verde's Role The works involved an assessment of the site geological and hydrogeological properties by use of trial pitting and groundwater monitoring well installations. A Tier 2 assessment comprises an assessment of past monitoring data, past hydrogeological assessments and publicly available data (e.g. EPA, GSI databases), in addition to further monitoring and a comparison of mo...
Read More

Groundwater Development for Anaerobic Digester Plant

Project Summary/Goals This project involved design, development and testing of groundwater resources to augment the water supply for an anaerobic digester plant located in disused basalt quarry in Co. Antrim. Procurement and development of groundwater resources on site will provide reduced operation water costs for the facility by providing an independent source of water for a proportion of th...
Read More

Soil, Geology & Hydrogeology Chapter for EIS

Project Summary/Goals This project involved preparation of soil, geology and hydrogeology Chapters for an EIS for a proposed Phase 2 development of Anaerobic Digester located in disused quarry in Co. Antrim. Information gathered during preparation of the Soil, Geology and Hydrogeology Chapter will be used in preparation of Environmental Impact Statement for the proposed further development of ...
Read More

Groundwater Resources Development

Project Summary/Goals This project involved examining the existing well field on the caravan park and developing a hydrogeological assessment to examine the potential of providing a more sustainable potable water supply for the site. Suitable well locations were located on-site taking into account suitable distances from surrounding potentially pollution sources and from potential saline int...
Read More

Lake Water Quality Monitoring

Project Summary/Goals This project involves undertaking set monthly monitoring Programmes of lakes throughout County Clare and Wicklow as part of the Water Framework Directive requirements of River Basin Management Plans. The monitoring works include sample collection at a total of 19 lakes in County Clare and six lakes in Wicklow. The project goal is to provide representative water quality ...
Read More

Hydrogeological and Appropriate Assessment

Project Summary/Goals This project involved examining the suitability of a greenfield site for use as a cemetery development. The site investigation works obtained the required information on the subsoil and groundwater conditions including baseline subsoil, surface water and groundwater quality. Available guidance documents in Ireland and the UK for cemetery developments were used to examine...
Read More

IPC Timber Site Remediation

Verde Projects - Timber Processing Plant
Project Summary/Goals The site was used for the treatment of timber with creosote from the 1970s until 2000, since which time it has been unoccupied. At the height of its production, approximately 80,000 poles were treated per year with 50 tonnes of creosote processed per week. Verde provide the client with Environmental Consultancy and Remediation services with the aim of surrendering their...
Read More

IPC Compliance Support Services

Verde Project - The Quinn Group
Project Summary/Goals The Quinn Group was established in 1973 and today it operates a number of sites including Cement manufacturing, Packaging manufacturing, landfill, power generation quarry sites. Verde provide the Quinn Group with Environmental Consultancy and Advisory services associated with their IPPC licensed operations and other environmentally sensitive sites. Recently we have been...
Read More

Brownfield Site Investigation

Verde Project - Pricewaterhouse Coopers
Project Summary/Goals A former commercial/industrial site was under consideration for redevelopment. A potential purchaser commissioned an environmental report which identified a number of areas of concern across the site in addition to suspected groundwater contamination moving off site. Further investigations were undertaken by Verde on behalf of the site owner (PwC acting as administer). ...
Read More
Top