# IED vs IPC licence: which one does your site need?

Canonical page: https://verde.ie/news/ied-vs-ipc-licence
Published by Verdé Environmental Group, 26 October 2026.

If your site carries out a specified industrial or waste activity in Ireland, it may need an EPA licence. The two regimes most often confused are Industrial Emissions (IE) licensing — which implements the Industrial Emissions Directive (IED) — and Integrated Pollution Control (IPC) licensing. They are separate authorisations with different activity classes.

## Key takeaways

- IE and IPC are distinct EPA licensing regimes; the terms are not interchangeable.
- Which EPA licence your site needs depends on the activity class, capacity and thresholds, not simply your business sector.
- An old IPPC reference in your paperwork does not establish the authorisation your site needs today.
- Verdé supports licence applications and compliance; the EPA decides whether to grant a licence.

## What the IED and an IE licence mean

The Industrial Emissions Directive is the European framework for controlling emissions from industrial installations. In Ireland it is given effect through the Industrial Emissions licensing regime: an IE licence is the EPA authorisation for industrial installations and certain waste activities within that regime. Check the applicable activity class, capacity and Best Available Techniques (BAT) requirements against current EPA guidance.

## What an IPC licence means

IPC stands for Integrated Pollution Control. An IPC licence controls pollution from certain industrial activities listed in the First Schedule to the EPA Act 1992, as amended, where IPC rather than IE licensing applies. The EPA's IPC application guidance cites the Integrated Pollution Control Licensing Regulations 2013 (S.I. 283/2013), amended by S.I. 189/2020.

## Where IPPC fits in

IPPC means Integrated Pollution Prevention and Control — a term in older licence records. The Industrial Emissions Directive replaced the earlier IPPC Directive. Current EPA guidance distinguishes IPC and Industrial Emissions licensing, so an old IPPC reference alone does not tell you which authorisation your site needs today.

## How to work out which licence your site needs

Start with what your site actually does: the process, materials, capacity, emissions and location. Compare the activity with the relevant legislation and EPA guidance before starting any application.

| Licence | Full name | Typically applies to |
| --- | --- | --- |
| IE licence | Industrial Emissions | Industrial installations and certain waste activities subject to the Industrial Emissions regime |
| IPC licence | Integrated Pollution Control | Certain industrial activities in the First Schedule to the EPA Act where IPC applies |
| Waste licence | EPA authorisation for specified waste activities | Specified waste disposal and recovery activities — not every waste facility needs one |

For waste activities, the EPA describes four possible authorisation outcomes: exemption, licence, waste facility permit, or certificate of registration.

## Planning permission is not a substitute

Planning documentation forms part of licensing applications, but planning permission does not replace the environmental authorisation a licensable activity needs. Coordinate the two processes before operating.

## Frequently asked questions

### What is the difference between IPPC, IPC and IE licensing?
IPPC is an older term from the previous European directive; the Industrial Emissions Directive replaced it. Current EPA guidance distinguishes IPC and Industrial Emissions (IE) licensing as separate regimes.

### Which Irish legislation covers IE and IPC licences?
The EPA Act 1992, as amended, provides the activity schedule. The EPA's IPC guidance cites the Integrated Pollution Control Licensing Regulations 2013 (S.I. 283/2013), amended by S.I. 189/2020. Industrial Emissions has a separate regime implementing the Industrial Emissions Directive.

### Who needs an EPA licence in Ireland?
Operators of specified industrial or waste activities whose activity falls within the relevant legislation and thresholds. Check the actual process and capacity, not only the sector name.

### Does planning permission replace an EPA licence?
No. Planning documentation is considered in licensing applications but is not a substitute for the environmental authorisation.

## Sources

- [EPA: Industrial Emissions Directive FAQs](https://www.epa.ie/our-services/licensing/industrial/industrial-emissions-licensing-ied/industrial-emissions-directive-faqs/)
- [EPA: How to apply for an IPC licence](https://www.epa.ie/our-services/licensing/industrial/integrated-pollution-control-ipc-licensing/how-to-apply-for-an-ipc-licence/)
- [EPA: IE licence application guidance](https://www.epa.ie/our-services/licensing/industrial/industrial-emissions-licensing-ied/how-to-apply-for-an-ie-licence/ie-licence-application-guidance/)
- [EPA: Who needs a waste licence](https://www.epa.ie/our-services/licensing/waste/waste-licensing/who-needs-a-waste-licence/)

## Next step

Verdé's licensing team checks the activity class and thresholds for your site, prepares application evidence and supports ongoing compliance: https://verde.ie/services/ippc-waste-licensing
