The right EPA licence depends on your activity, scale and site — not your business sector. Here's how the Industrial Emissions and IPC regimes differ, and how to check which applies.

Illustration of an Irish industrial facility beside a licence document with a checkmark shield, in Verdé navy and lime

Key takeaways

  • IE (Industrial Emissions) and IPC (Integrated Pollution Control) are distinct EPA licensing regimes — the terms are not interchangeable.
  • Which EPA licence your site needs depends on the activity class, capacity and thresholds, not simply your business sector.
  • An old IPPC reference in your paperwork does not establish the authorisation your site needs today.
  • Verdé supports licence applications and compliance; the EPA decides whether to grant a licence.

If your site carries out a specified industrial or waste activity in Ireland, it may need an EPA licence. The two regimes people most often confuse are Industrial Emissions (IE) licensing — the regime that implements the Industrial Emissions Directive, or IED — and Integrated Pollution Control (IPC) licensing. They are separate authorisations with different activity classes, and choosing the wrong route costs time.

What the IED and an IE licence mean

The Industrial Emissions Directive is the European framework for controlling emissions from industrial installations. In Ireland it is given effect through the Industrial Emissions licensing regime: an IE licence is the EPA authorisation for industrial installations and certain waste activities that fall within that regime. Confirming whether your installation is in scope means checking the applicable activity class, capacity and the Best Available Techniques (BAT) requirements against current EPA guidance.

What an IPC licence means

IPC stands for Integrated Pollution Control. An IPC licence controls pollution from certain industrial activities listed in the First Schedule to the EPA Act 1992, as amended, where IPC rather than IE licensing applies. The EPA's IPC application guidance cites the Integrated Pollution Control Licensing Regulations 2013 (S.I. 283/2013), amended by S.I. 189/2020.

Where IPPC fits in

IPPC means Integrated Pollution Prevention and Control — a term you may still see in older licence records. The Industrial Emissions Directive replaced the earlier IPPC Directive. Current EPA guidance distinguishes IPC and Industrial Emissions licensing, so an old IPPC reference alone does not tell you which authorisation your site needs today.

Your activity, capacity & thresholdschecked against the EPA Act schedule & EPA guidanceIE licenceIndustrial Emissions (IED)IPC licenceIntegrated Pollution ControlWaste routeLicence, permit or exemption
Decision flow: check your activity class and thresholds against the EPA Act schedule and EPA guidance, leading to an IE licence, an IPC licence, a waste licence or a local-authority permit

How to work out which licence your site needs

Start with what your site actually does: the process, materials, capacity, emissions and location. Compare the activity with the relevant legislation and EPA guidance before starting any application. The sector name on your headed paper is not the test — two businesses in the same sector can need different authorisations because their activities and scale differ.

The three EPA licensing regimes at a glance — confirm your own route with current EPA guidance.
LicenceFull nameTypically applies to
IE licenceIndustrial EmissionsIndustrial installations and certain waste activities subject to the Industrial Emissions regime
IPC licenceIntegrated Pollution ControlCertain industrial activities in the First Schedule to the EPA Act where IPC applies
Waste licenceEPA authorisation for specified waste activitiesSpecified waste disposal and recovery activities — not every waste facility needs one

For waste activities specifically, the EPA describes four possible authorisation outcomes: an exemption, a licence, a waste facility permit, or a certificate of registration. The correct route depends on the activity and the applicable rules, and the EPA and local authorities have different responsibilities.

Planning permission is not a substitute

Planning documentation forms part of the information considered in licensing applications, but planning permission does not replace the environmental authorisation a licensable activity needs. The two processes may need to be coordinated, so confirm the requirements for your project before operating.

Frequently asked questions

What is the difference between IPPC, IPC and IE licensing?

IPPC (Integrated Pollution Prevention and Control) is an older term from the previous European directive. The Industrial Emissions Directive replaced it. Current EPA guidance distinguishes IPC and Industrial Emissions (IE) licensing as separate regimes, so an old IPPC reference does not establish the authorisation your site needs today.

Which Irish legislation covers IE and IPC licences?

The EPA Act 1992, as amended, provides the activity schedule used in industrial licensing. The EPA's IPC guidance cites the Integrated Pollution Control Licensing Regulations 2013 (S.I. 283/2013), amended by S.I. 189/2020. Industrial Emissions has a separate regime implementing the Industrial Emissions Directive.

Who needs an EPA licence in Ireland?

Operators of specified industrial or waste activities may need an EPA licence when their activity falls within the relevant legislation and thresholds. Check the actual process and capacity, not only the sector name. Some waste activities instead require a local-authority permit or registration, and others may qualify for an exemption.

Does planning permission replace an EPA licence?

No. Planning documentation is part of the information considered in licensing applications, but it is not a substitute for the environmental authorisation required for a licensable activity. Coordinate the two processes before operating.